618 Promontory Ln
Dallas, TX 75208
618 Promontory Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 618 Promontory Ln, Dallas, TX 75208. The most recent, filed June 2, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Jun 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 618 Promontory Ln
What is being built at 618 Promontory Ln?
The latest filing (City of Dallas permit RES-PLM-25-001038, June 2, 2025) covers gas test.
How many permits and filings does 618 Promontory Ln have?
1 filing across 1 project, from June 2, 2025 to June 2, 2025.
Is there other construction near 618 Promontory Ln?
Yes. Nearby filings include 650 Promontory Ln (run new electric for in ground swimming pool, Oct 22, 2025); 700 N Oak Cliff Blvd (4 ton 15 straight cool change out, Sep 10, 2026); 702 N Oak Cliff Blvd (connected generator to gas service, Jun 24, 2026).
How do I get alerts for new permits at 618 Promontory Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 650 Promontory LnOct 22, 2025Run new electric for in ground swimming pool · 66 m away
- 700 N Oak Cliff BlvdSep 10, 20264 ton 15 straight cool change out · 108 m away
- 702 N Oak Cliff BlvdJun 24, 2026Connected generator to gas service · 109 m away
- 630 Stevens Village DrMay 27, 2026Repair lugs on meter base · 111 m away
- 672 Promontory LnSep 17, 2026Install a 9.135 kw roof mounted pv solar system, 21 panels · 113 m away
- 630 N Oak Cliff BlvdApr 5, 2026Removing existing roof and installing new lifetime, architectural style shingles · 119 m away
- 722 N Oak Cliff BlvdJan 15, 2026Replace cast iron under back guest house with new schedule 40 pvc · 122 m away
- 676 Promontory LnMar 17, 2026Mcr with batt (3rd) install a 16.530 kw roof mounted pv solar system, 38 panels. a tesla energy gateway-3, tesla powerwall-3, & enphase iq gateway. utility shutdown required to install teg & (n) span panel · 126 m away
- 631 N Oak Cliff BlvdMay 29, 2025Re-roof composite shingle · 130 m away
- 677 Aspen Valley LnJun 5, 2026Mcr with battery installation of a 8.7kw roof mount pvsolar system with 1 tesla powerwall-3 inverter / gateway.utility shutdown needed to install the teg · 133 m away
- 610 N Oak Cliff BlvdMay 28, 2025Commercial mechanical permit · 135 m away
- 610 N Oak Cliff BlvdAug 25, 2026Zo bc new in-ground 160sf concrete pool and associated equipment and pad · 135 m away