722 N Oak Cliff Blvd
Dallas, TX 75208
Plumbing permit for guest house at 722 N Oak Cliff Blvd
A City of Dallas plumbing permit indicates cast iron pipe beneath the back guest house will be replaced with Schedule 40 PVC at 722 N Oak Cliff Blvd. The permit was filed January 15, 2026.
Summarized from City of Dallas records · updated Jan 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 15, 2026
- since Jan 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 722 N Oak Cliff Blvd
What is being built at 722 N Oak Cliff Blvd?
The City of Dallas record is for plumbing work, not a new building: replacing cast iron pipe beneath the back guest house with Schedule 40 PVC. Permit RES-PLM-26-000557 was filed January 15, 2026.
Is a new house going up at 722 N Oak Cliff Blvd?
The available permit record describes plumbing replacement beneath the back guest house. It does not describe construction of a new house.
What plumbing work is planned at 722 N Oak Cliff Blvd?
The permit describes replacing cast iron pipe under the back guest house with new Schedule 40 PVC. It was filed with the City of Dallas on January 15, 2026.
When was the plumbing permit filed for 722 N Oak Cliff Blvd?
The City of Dallas filed permit RES-PLM-26-000557 on January 15, 2026.
What is permit RES-PLM-26-000557 for?
It is a residential plumbing permit for replacing cast iron pipe beneath the back guest house at 722 N Oak Cliff Blvd with Schedule 40 PVC.
Also being built nearby
All of 75208- 727 N Oak Cliff BlvdJun 23, 2025Replace hvac on main house add to new addition · 14 m away
- 702 N Oak Cliff BlvdJun 24, 2026Connected generator to gas service · 28 m away
- 700 N Oak Cliff BlvdSep 10, 20264 ton 15 straight cool change out · 31 m away
- 722 Tenna Loma CtNov 23, 2020Remodel · 97 m away
- 650 Promontory LnOct 22, 2025Run new electric for in ground swimming pool · 101 m away
- 672 Promontory LnSep 17, 2026Install a 9.135 kw roof mounted pv solar system, 21 panels · 112 m away
- 676 Promontory LnMar 17, 2026Mcr with batt (3rd) install a 16.530 kw roof mounted pv solar system, 38 panels. a tesla energy gateway-3, tesla powerwall-3, & enphase iq gateway. utility shutdown required to install teg & (n) span panel · 118 m away
- 802 N Oak Cliff BlvdJan 30, 2026Hvac replacement · 121 m away
- 618 Promontory LnJun 2, 2025Gas test · 122 m away
- 706 Kessler Woods TrlAug 13, 2025Replaced existing tankless with new tankless · 122 m away
- 630 N Oak Cliff BlvdApr 5, 2026Removing existing roof and installing new lifetime, architectural style shingles · 129 m away
- 631 N Oak Cliff BlvdMay 29, 2025Re-roof composite shingle · 130 m away