Rooftop solar and battery installation at 676 Promontory Ln
A 16.53-kW rooftop solar system with 38 panels and battery equipment is planned at 676 Promontory Ln. City of Dallas solar and electrical permits were filed on March 17, 2026, for the installation, which also includes a Tesla Energy Gateway-3, Tesla Powerwall-3, Enphase IQ Gateway, and a new Span panel.
Summarized from City of Dallas records · updated Mar 17, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Mar 17, 2026
- since Mar 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsMcr with batt (3rd) install a 16.530 kw roof mounted pv solar system, 38 panels. a tesla energy gateway-3, tesla powerwall-3, & enphase iq gateway. utility shutdown required to install teg & (n) span panel
Mcr with batt (3rd) install a 16.530 kw roof mounted pv solar system, 38 panels. a tesla energy gateway-3, tesla powerwall-3, & enphase iq gateway. utility shutdown required to install teg & (n) span panel
City of Dallas permitResidential Solar/PV PermitMcr with batt (3rd) install a 16.530 kw roof mounted pv solar system, 38 panels. a tesla energy gateway-3, tesla powerwall-3, & enphase iq gateway. utility shutdown required to install teg & (n) span panel
Mcr with batt (3rd) install a 16.530 kw roof mounted pv solar system, 38 panels. a tesla energy gateway-3, tesla powerwall-3, & enphase iq gateway. utility shutdown required to install teg & (n) span panel
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 676 Promontory Ln
What is being installed at 676 Promontory Ln?
City of Dallas permits indicate a 16.53-kW rooftop solar system with 38 panels and battery equipment. The permits were filed March 17, 2026.
How many solar panels are planned at 676 Promontory Ln?
The permit description lists 38 rooftop panels for a 16.53-kW solar system.
Will the solar installation include a battery?
Yes. The permit description lists a Tesla Powerwall-3 and Tesla Energy Gateway-3, along with an Enphase IQ Gateway.
When was the solar work at 676 Promontory Ln permitted?
The City of Dallas filed the solar permit RES-SOLAR-26-000091 and electrical permit RES-ELC-26-001507 on March 17, 2026.
Will electrical service need to be shut down for the installation?
The permit description says a utility shutdown is required to install the Tesla Energy Gateway-3 and new Span panel.
Also being built nearby
All of 75208- 672 Promontory LnSep 17, 2026Install a 9.135 kw roof mounted pv solar system, 21 panels · 13 m away
- 677 Aspen Valley LnJun 5, 2026Mcr with battery installation of a 8.7kw roof mount pvsolar system with 1 tesla powerwall-3 inverter / gateway.utility shutdown needed to install the teg · 38 m away
- 2139 Centennial Valley LnJun 4, 2025Re-roof of house · 40 m away
- 650 Promontory LnOct 22, 2025Run new electric for in ground swimming pool · 59 m away
- 722 N Oak Cliff BlvdJan 15, 2026Replace cast iron under back guest house with new schedule 40 pvc · 118 m away
- 2227 Kessler Woods CtJul 13, 2026Replace 3 ton condenser and coil only · 121 m away
- 802 N Oak Cliff BlvdJan 30, 2026Hvac replacement · 121 m away
- 706 Kessler Woods TrlAug 13, 2025Replaced existing tankless with new tankless · 124 m away
- 618 Promontory LnJun 2, 2025Gas test · 126 m away
- 727 N Oak Cliff BlvdJun 23, 2025Replace hvac on main house add to new addition · 127 m away
- 702 N Oak Cliff BlvdJun 24, 2026Connected generator to gas service · 134 m away
- 700 N Oak Cliff BlvdSep 10, 20264 ton 15 straight cool change out · 136 m away
More solar installs in 75208.