807 S Waverly Dr
Dallas, TX 75208
807 S Waverly Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 807 S Waverly Dr, Dallas, TX 75208. The most recent, filed June 2, 2025, covers: “3.5 ton system”.
Compiled from City of Dallas records · updated Jun 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 807 S Waverly Dr
What is being built at 807 S Waverly Dr?
The latest filing (City of Dallas permit RES-MEC-25-000447, June 2, 2025) covers 3.5 ton system.
How many permits and filings does 807 S Waverly Dr have?
1 filing across 1 project, from June 2, 2025 to June 2, 2025.
Is there other construction near 807 S Waverly Dr?
Yes. Nearby filings include 815 S Waverly Dr (gas line to pool heater and grill and water reroute, Mar 18, 2026); 822 S Waverly Dr (mcr installation of 6.320kw roof mounted solar panels with ess storage system enphase iq battery 5kwh, Jun 20, 2025); 729 S Waverly Dr (gas pressure test, Feb 25, 2026).
How do I get alerts for new permits at 807 S Waverly Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 815 S Waverly DrMar 18, 2026Gas line to pool heater and grill and water reroute · 9 m away
- 822 S Waverly DrJun 20, 2025Mcr installation of 6.320kw roof mounted solar panels with ess storage system enphase iq battery 5kwh · 22 m away
- 729 S Waverly DrFeb 25, 2026Gas pressure test · 89 m away
- 807 S Brighton AveApr 27, 2026Re-roof · 114 m away
- 813 S Brighton AveAug 6, 2025Gas test · 114 m away
- 703 S Waverly DrMay 28, 20266.560 kw dc roof mount solar pv system with 16 qcells: q.peak duo blk ml-g10.c+ 410w pv modules with 16 enphase: iq8hc-72-m-dom-us [240v] microinverter · 119 m away
- 834 S Rosemont AveFeb 2, 2026Storm damagerepair 125 amp meter base and riser · 127 m away
- 724 S Brighton AveDec 6, 2025We will be removing the existing shingles down to the decking and installing new material to the roof. we will be installing atlas pinnacle pristine products · 138 m away
- 720 S Brighton AveNov 22, 2020Permanent electrical service · 141 m away
- 708 S Brighton AveDec 3, 2020Interior/ exterior remodel · 151 m away
- 719 S Brighton AveSep 3, 2026Reset and re-shim 150 sq ft of the understructure · 152 m away
- 908 S Brighton AveOct 16, 2020Replace water service · 165 m away