708 S Brighton Ave
Dallas, TX 75208
708 S Brighton Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 708 S Brighton Ave, Dallas, TX 75208. The most recent, filed December 3, 2020, covers: “Interior/ exterior remodel”.
Compiled from City of Dallas records · updated Dec 3, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 3, 2020
- since Dec 3, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 708 S Brighton Ave
What is being built at 708 S Brighton Ave?
The latest filing (City of Dallas permit 2012021180, December 3, 2020) covers interior/ exterior remodel.
How many permits and filings does 708 S Brighton Ave have?
1 filing across 1 project, from December 3, 2020 to December 3, 2020.
Is there other construction near 708 S Brighton Ave?
Yes. Nearby filings include 720 S Brighton Ave (permanent electrical service, Nov 22, 2020); 719 S Brighton Ave (reset and re-shim 150 sq ft of the understructure, Sep 3, 2026); 724 S Brighton Ave (we will be removing the existing shingles down to the decking and installing new material to the roof. we will be installing atlas pinnacle pristine products, Dec 6, 2025).
How do I get alerts for new permits at 708 S Brighton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 720 S Brighton AveNov 22, 2020Permanent electrical service · 14 m away
- 719 S Brighton AveSep 3, 2026Reset and re-shim 150 sq ft of the understructure · 17 m away
- 724 S Brighton AveDec 6, 2025We will be removing the existing shingles down to the decking and installing new material to the roof. we will be installing atlas pinnacle pristine products · 19 m away
- 1915 W Brooklyn AveSep 10, 2025Relocate gas meter · 35 m away
- 703 S Waverly DrMay 28, 20266.560 kw dc roof mount solar pv system with 16 qcells: q.peak duo blk ml-g10.c+ 410w pv modules with 16 enphase: iq8hc-72-m-dom-us [240v] microinverter · 102 m away
- 729 S Waverly DrFeb 25, 2026Gas pressure test · 104 m away
- 613 S Brighton AveOct 29, 2026Conversion of existing pantry (only overhead light present) to bathroom. wiring will be on a dedicated 20a circuit running from the panel to a gfci outlet, then to a switch box with exits to vanity light, overhead light, and an exhaust fan · 112 m away
- 807 S Brighton AveApr 27, 2026Re-roof · 114 m away
- 813 S Brighton AveAug 6, 2025Gas test · 121 m away
- 705 S Marlborough AveOct 20, 2020Service release no work · 127 m away
- 711 S Marlborough AveDec 7, 2025Gas test · 128 m away
- 2009 W Brooklyn AveAug 11, 2025Mcr with battery new pv+battery system13 modules - 4.810 kw dc, 3.770 kw ac system sizebattery: (1) enphase iqbattery-5p-1p-na · 137 m away