1915 W Brooklyn Ave
Dallas, TX 75208
1915 W Brooklyn Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 1915 W Brooklyn Ave, Dallas, TX 75208. The most recent, filed September 10, 2025, covers: “Relocate gas meter”.
Compiled from City of Dallas records · updated Sep 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2025
- since Sep 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1915 W Brooklyn Ave
What is being built at 1915 W Brooklyn Ave?
The latest filing (City of Dallas permit RES-PLM-25-004769, September 10, 2025) covers relocate gas meter.
How many permits and filings does 1915 W Brooklyn Ave have?
1 filing across 1 project, from September 10, 2025 to September 10, 2025.
Is there other construction near 1915 W Brooklyn Ave?
Yes. Nearby filings include 708 S Brighton Ave (interior/ exterior remodel, Dec 3, 2020); 719 S Brighton Ave (reset and re-shim 150 sq ft of the understructure, Sep 3, 2026); 720 S Brighton Ave (permanent electrical service, Nov 22, 2020).
How do I get alerts for new permits at 1915 W Brooklyn Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 708 S Brighton AveDec 3, 2020Interior/ exterior remodel · 35 m away
- 719 S Brighton AveSep 3, 2026Reset and re-shim 150 sq ft of the understructure · 36 m away
- 720 S Brighton AveNov 22, 2020Permanent electrical service · 45 m away
- 724 S Brighton AveDec 6, 2025We will be removing the existing shingles down to the decking and installing new material to the roof. we will be installing atlas pinnacle pristine products · 49 m away
- 613 S Brighton AveOct 29, 2026Conversion of existing pantry (only overhead light present) to bathroom. wiring will be on a dedicated 20a circuit running from the panel to a gfci outlet, then to a switch box with exits to vanity light, overhead light, and an exhaust fan · 91 m away
- 705 S Marlborough AveOct 20, 2020Service release no work · 102 m away
- 711 S Marlborough AveDec 7, 2025Gas test · 103 m away
- 2009 W Brooklyn AveAug 11, 2025Mcr with battery new pv+battery system13 modules - 4.810 kw dc, 3.770 kw ac system sizebattery: (1) enphase iqbattery-5p-1p-na · 108 m away
- 703 S Waverly DrMay 28, 20266.560 kw dc roof mount solar pv system with 16 qcells: q.peak duo blk ml-g10.c+ 410w pv modules with 16 enphase: iq8hc-72-m-dom-us [240v] microinverter · 131 m away
- 807 S Brighton AveApr 27, 2026Re-roof · 136 m away
- 729 S Waverly DrFeb 25, 2026Gas pressure test · 137 m away
- 813 S Brighton AveAug 6, 2025Gas test · 143 m away