719 S Brighton Ave
Dallas, TX 75208
Foundation and sewer repairs permitted at 719 S Brighton Ave
City of Dallas permits indicate foundation and sewer-line repair work at this residence, rather than a new building project. The sewer permit was filed August 6, 2026, and the foundation repair permit followed on September 3, 2026.
Summarized from City of Dallas records · updated Sep 3, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 3, 2026
- since Aug 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsThis is to replace sewer outside the house from clean outs all the way to city top by rerouting lines next to garage
This is to replace sewer outside the house from clean outs all the way to city top by rerouting lines next to garage
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 719 S Brighton Ave
What is being done at 719 S Brighton Ave?
City of Dallas permits list sewer-line replacement and foundation work at the residence. The filings are dated August 6 and September 3, 2026.
Is a new home being built at 719 S Brighton Ave?
The records provided show permits for residential sewer and foundation repairs, not a new-home construction project.
What foundation work is planned at 719 S Brighton Ave?
Permit RES-FDN-26-000741, filed September 3, 2026, describes resetting and re-shimming 150 square feet of the understructure.
What sewer work is planned at 719 S Brighton Ave?
Permit RES-PLM-26-008211, filed August 6, 2026, describes replacing the sewer line outside the house and rerouting lines next to the garage.
When were permits filed for work at 719 S Brighton Ave?
The sewer permit was filed August 6, 2026, and the foundation repair permit was filed September 3, 2026.
Also being built nearby
All of 75208- 720 S Brighton AveNov 22, 2020Permanent electrical service · 13 m away
- 724 S Brighton AveDec 6, 2025We will be removing the existing shingles down to the decking and installing new material to the roof. we will be installing atlas pinnacle pristine products · 15 m away
- 708 S Brighton AveDec 3, 2020Interior/ exterior remodel · 17 m away
- 1915 W Brooklyn AveSep 10, 2025Relocate gas meter · 36 m away
- 807 S Brighton AveApr 27, 2026Re-roof · 102 m away
- 813 S Brighton AveAug 6, 2025Gas test · 109 m away
- 729 S Waverly DrFeb 25, 2026Gas pressure test · 115 m away
- 711 S Marlborough AveDec 7, 2025Gas test · 115 m away
- 705 S Marlborough AveOct 20, 2020Service release no work · 115 m away
- 703 S Waverly DrMay 28, 20266.560 kw dc roof mount solar pv system with 16 qcells: q.peak duo blk ml-g10.c+ 410w pv modules with 16 enphase: iq8hc-72-m-dom-us [240v] microinverter · 116 m away
- 613 S Brighton AveOct 29, 2026Conversion of existing pantry (only overhead light present) to bathroom. wiring will be on a dedicated 20a circuit running from the panel to a gfci outlet, then to a switch box with exits to vanity light, overhead light, and an exhaust fan · 123 m away
- 2009 W Brooklyn AveAug 11, 2025Mcr with battery new pv+battery system13 modules - 4.810 kw dc, 3.770 kw ac system sizebattery: (1) enphase iqbattery-5p-1p-na · 126 m away