705 S Marlborough Ave
Dallas, TX 75208
705 S Marlborough Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 705 S Marlborough Ave, Dallas, TX 75208. The most recent, filed October 20, 2020, covers: “Service release no work”.
Compiled from City of Dallas records · updated Oct 20, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 20, 2020
- since Oct 20, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 705 S Marlborough Ave
What is being built at 705 S Marlborough Ave?
The latest filing (City of Dallas permit 2010201026, October 20, 2020) covers service release no work.
How many permits and filings does 705 S Marlborough Ave have?
1 filing across 1 project, from October 20, 2020 to October 20, 2020.
Is there other construction near 705 S Marlborough Ave?
Yes. Nearby filings include 711 S Marlborough Ave (gas test, Dec 7, 2025); 2009 W Brooklyn Ave (mcr with battery new pv+battery system13 modules - 4.810 kw dc, 3.770 kw ac system sizebattery: (1) enphase iqbattery-5p-1p-na, Aug 11, 2025); 1915 W Brooklyn Ave (relocate gas meter, Sep 10, 2025).
How do I get alerts for new permits at 705 S Marlborough Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 711 S Marlborough AveDec 7, 2025Gas test · 7 m away
- 2009 W Brooklyn AveAug 11, 2025Mcr with battery new pv+battery system13 modules - 4.810 kw dc, 3.770 kw ac system sizebattery: (1) enphase iqbattery-5p-1p-na · 19 m away
- 1915 W Brooklyn AveSep 10, 2025Relocate gas meter · 102 m away
- 719 S Brighton AveSep 3, 2026Reset and re-shim 150 sq ft of the understructure · 115 m away
- 811 S Marlborough AveJul 8, 2025Install 4 ton a/c system complete · 121 m away
- 708 S Brighton AveDec 3, 2020Interior/ exterior remodel · 127 m away
- 720 S Brighton AveNov 22, 2020Permanent electrical service · 128 m away
- 724 S Brighton AveDec 6, 2025We will be removing the existing shingles down to the decking and installing new material to the roof. we will be installing atlas pinnacle pristine products · 129 m away
- 711 S Oak Cliff BlvdApr 15, 2026Install plumbing for remodel--addition · 131 m away
- 614 S Oak Cliff BlvdNov 2, 2026House rewire and service panel · 137 m away
- 613 S Brighton AveOct 29, 2026Conversion of existing pantry (only overhead light present) to bathroom. wiring will be on a dedicated 20a circuit running from the panel to a gfci outlet, then to a switch box with exits to vanity light, overhead light, and an exhaust fan · 159 m away
- 807 S Brighton AveApr 27, 2026Re-roof · 162 m away