811 S Marlborough Ave
Dallas, TX 75208
Residential new-building permits at 811 S Marlborough Ave
Permits indicate residential new construction at 811 S Marlborough Ave. Electrical and plumbing permits were filed June 3, 2025, followed by a permit for a 4-ton air-conditioning system on July 8, 2025.
Summarized from City of Dallas records · updated Jul 8, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jul 8, 2025
- since Jun 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 811 S Marlborough Ave
What is being built at 811 S Marlborough Ave?
City of Dallas records include an electrical permit for a new building and a new plumbing installation, indicating residential new construction.
When were permits filed for 811 S Marlborough Ave?
The electrical and plumbing permits were filed June 3, 2025. The air-conditioning permit was filed July 8, 2025.
What does the electrical permit at 811 S Marlborough Ave cover?
Permit RES-ELC-25-000543, filed June 3, 2025, describes electrical work for a new building.
Is new plumbing planned at 811 S Marlborough Ave?
A City of Dallas residential plumbing permit for a new plumbing installation was filed June 3, 2025. Its permit number is RES-PLM-25-001098.
What kind of air-conditioning system is permitted at 811 S Marlborough Ave?
Permit RES-MEC-25-001159, filed July 8, 2025, covers installation of a complete 4-ton air-conditioning system.
Also being built nearby
All of 75208- 826 S Oak Cliff BlvdOct 6, 2026Install 16 total pilings (13 exterior, 1 exterior with concrete breakouts, 3 interior via the crawlspace).reset/re-shim 1630 sq ft of the structure with steel to improve leveling · 104 m away
- 813 S Brighton AveAug 6, 2025Gas test · 114 m away
- 807 S Brighton AveApr 27, 2026Re-roof · 114 m away
- 711 S Marlborough AveDec 7, 2025Gas test · 114 m away
- 906 S Marlborough AveAug 12, 2025Replace prv at mainline · 121 m away
- 705 S Marlborough AveOct 20, 2020Service release no work · 121 m away
- 916 S Marlborough AveJan 28, 2021Addition to sfd · 132 m away
- 2009 W Brooklyn AveAug 11, 2025Mcr with battery new pv+battery system13 modules - 4.810 kw dc, 3.770 kw ac system sizebattery: (1) enphase iqbattery-5p-1p-na · 139 m away
- 1914 Burlington BlvdOct 15, 2020Construct new sfd · 150 m away
- 1910 Burlington BlvdNov 26, 2025Gas test · 152 m away
- 719 S Brighton AveSep 3, 2026Reset and re-shim 150 sq ft of the understructure · 158 m away
- 724 S Brighton AveDec 6, 2025We will be removing the existing shingles down to the decking and installing new material to the roof. we will be installing atlas pinnacle pristine products · 163 m away