3764 W Northwest Hwy
Dallas, TX 75209
3764 W Northwest Hwy: 1 project on record
City of Dallas lists 1 filing across 1 project at 3764 W Northwest Hwy, Dallas, TX 75209. The most recent, filed October 27, 2020, covers: “Erect attached sign”.
Compiled from City of Dallas records · updated Oct 27, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 27, 2020
- since Oct 27, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3764 W Northwest Hwy
What is being built at 3764 W Northwest Hwy?
The latest filing (City of Dallas permit 2010191086, October 27, 2020) covers erect attached sign.
How many permits and filings does 3764 W Northwest Hwy have?
1 filing across 1 project, from October 27, 2020 to October 27, 2020.
What is being built near Carroll Concerns Ltd Ps in Dallas?
3764 W Northwest Hwy is about 57 m from Carroll Concerns Ltd Ps (3780 W Northwest Hwy). Its latest filing is for erect attached sign.
Is there other construction near 3764 W Northwest Hwy?
Yes. Nearby filings include 3760 W Northwest Hwy (erect attached sign, Nov 9, 2020); 3780 W Northwest Hwy (midway hollow pet clinic — renovation/alteration — interior renovation of the first floor of an existing veterinary hospital - to include a new interior layout with new interior finishes, Jan 29, 2025); 3767 Wnorthwest Pkwy (take 5 oil change - dallas (conversion) — renovation/alteration — remodels of exhausting repair facility, Oct 29, 2026).
How do I get alerts for new permits at 3764 W Northwest Hwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75209- 3764 W Northwest Hwy · Goodwill Industries Of Dallas Inc.Jun 30, 2026Zo bc this project consists of the remodel of an existing 4,085-sq ft tenant space. approximately 1,975 sq ft will undergo complete interior demolition and renovation to accomodate the new production/stockroom area. the remaining 2,110 sq ft will receive minor alterations and finish updates and will function as the sales floor. the project will also include limited exterior storefront modifications for the installation of new doors. approximately 5'x10' of existing sidewalk will be removed for new concrete loading ramp
- 3760 W Northwest HwyNov 9, 2020Erect attached sign · 14 m away
- 3780 W Northwest Hwy · Carroll Concerns Ltd PsJan 29, 2025Midway hollow pet clinic — renovation/alteration — interior renovation of the first floor of an existing veterinary hospital - to include a new interior layout with new interior finishes · 57 m away
- 3767 Wnorthwest Pkwy · Leak Properties LtdOct 29, 2026Take 5 oil change - dallas (conversion) — renovation/alteration — remodels of exhausting repair facility · 122 m away
- 3767 W Northwest HwyOct 23, 2026Exp bu zo me pl a remodel for an existing auto repair facility to a quick service oil change · 122 m away
- 3740 W Northwest HwyJun 10, 2026Demolish and remove building to slab level. site paving will remain · 133 m away
- 3733 W Northwest HwyApr 14, 2026Replaced 3/4" rpz backflow preventer · 136 m away
- 3701 W Northwest HwyAug 31, 2026Excavate and remove existing metal grease interceptorinstall new gb-75 grease interceptor and sv-10 sample well · 150 m away
- 3820 W Northwest Hwy · Chick-Fil-A, Inc.Jul 24, 2026Taking out single order window and installing a double sliding door in its place as well as a air curtain and mini split to serve the drive thru area for this added door · 188 m away
- 3830 W Northwest HwyNov 17, 2020Service release no work · 213 m away
- 3811 Lenel DrNov 16, 2026Contractor shall furnish all necessary labor, materials, tools, and equipment to replace approximately 65 linear feet of existing gas piping throughout the property.the work shall include the following:1. remove and replace approximately 65 feet of existing gas piping using a combination of new black iron steel piping and approved csst (corrugated stainless steel tubing), as required for the installation.2. install new black iron steel gas piping in designated areas underneath the home and along the exterior wall of the residence.3. install new approved csst piping in designated areas, including all required fittings, supports, and connections in accordance with applicable local gas codes and manufacturer specifications.4. remove sections of sheetrock as necessary to gain access to existing gas piping and complete the installation.5. furnish and install three (3) new gas shut-off valves and three (3) new gas flex connectors for the designated gas appliances or connections.6. properly secure, support, and connect all newly installed gas piping.7. perform the required gas pressure test and leak inspection to verify the integrity of the newly installed gas piping system.8. obtain the required plumbing/mechanical permit, as applicable, and coordinate the required inspection with the local authority having jurisdiction.9. restore gas service upon successful completion of the required testing and approval, where applicable · 227 m away
- 3710 W Northwest HwyOct 16, 2025Commercial re-roof · 235 m away