3701 W Northwest Hwy
Dallas, TX 75220
Grease interceptor and sample well installation
A new GB-75 grease interceptor and SV-10 sample well are being installed at 3701 W Northwest Hwy. A City of Dallas commercial plumbing permit for the work was filed August 31, 2026; it also covers removing the existing grease interceptor.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Aug 31, 2026
- Projects
- 9
- 9 filings
- Latest filing
- Aug 31, 2026
- since Aug 31, 2026
- Largest scope
- —
- Estimated cost
- $150K
- state registration
Where this project stands
CompletedCenterwell NW Dallas
2,209 sq ft · $150K est.
- RegisteredMay 9, 2023
- Plan review
- ConstructionMay '23 – Sep '23
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
9 projectsExcavate and remove existing metal grease interceptorinstall new gb-75 grease interceptor and sv-10 sample well
Excavate and remove existing metal grease interceptorinstall new gb-75 grease interceptor and sv-10 sample well
City of Dallas permitCommercial Plumbing PermitRemove and replace existing brick paver sidewalk to ensure ada compliant slopes. remove and replace asphalt parking area to add new ada parking spaces. remove and replace existing concrete ramp to ensure ada compliance. total limits of disturbance = — village of bachman lake
TDLR project registrationRenovation/AlterationProject Closed2,209 sq ft$150K est.- Project #
- TABS2023018670
- Tenant / owner
- Centerwell NW Dallas
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 3701 W Northwest Hwy
What is being built at 3701 W Northwest Hwy?
A City of Dallas permit covers removing an existing grease interceptor and installing a GB-75 grease interceptor and an SV-10 sample well.
When was the plumbing work at 3701 W Northwest Hwy permitted?
The commercial plumbing permit was filed August 31, 2026. Its number is COM-PLM-26-003368.
Is a new building going up at 3701 W Northwest Hwy?
The record is for plumbing work, not a new building. It covers replacing an existing grease interceptor and installing a sample well.
What's being installed near Take 5 Oil Change on W Northwest Hwy?
At 3701 W Northwest Hwy, a permit covers installation of a GB-75 grease interceptor and an SV-10 sample well. The Take 5 Oil Change project is listed at 3767 W Northwest Hwy.
What work is happening near the Goodwill on W Northwest Hwy?
At 3701 W Northwest Hwy, the permitted work is removal of an existing grease interceptor and installation of a new one and a sample well. Goodwill's address in the records is 3764 W Northwest Hwy.
Is there a plumbing project near Chick-fil-A on W Northwest Hwy?
A commercial plumbing permit at 3701 W Northwest Hwy covers a grease interceptor replacement and sample well installation. The Chick-fil-A project is listed at 3820 W Northwest Hwy.
Also being built nearby
All of 75220- 3733 W Northwest HwyApr 14, 2026Replaced 3/4" rpz backflow preventer · 14 m away
- 3767 Wnorthwest Pkwy · Leak Properties LtdOct 29, 2026Take 5 oil change - dallas (conversion) — renovation/alteration — remodels of exhausting repair facility · 29 m away
- 3767 W Northwest HwyOct 23, 2026Exp bu zo me pl a remodel for an existing auto repair facility to a quick service oil change · 29 m away
- 3740 W Northwest HwyJun 10, 2026Demolish and remove building to slab level. site paving will remain · 35 m away
- 3710 W Northwest HwyOct 16, 2025Commercial re-roof · 94 m away
- 3760 W Northwest HwyNov 9, 2020Erect attached sign · 136 m away
- 9410 Webb Chapel RdMay 13, 2026Walmart has requested that timberlyn perform an exterior lighting upgrade. walmart does this every 7 to 10 years. we will be replacing the existing led light fixture with a new, more efficient led fixture. timberlyn is only the labor source. acuity brands lighting is supplying all necessary materials and the photometrics. this site is getting a total of 97 fixtures installed, with 9 of them being new installations · 139 m away
- 3764 W Northwest Hwy · Goodwill Industries Of Dallas Inc.Jun 30, 2026Zo bc this project consists of the remodel of an existing 4,085-sq ft tenant space. approximately 1,975 sq ft will undergo complete interior demolition and renovation to accomodate the new production/stockroom area. the remaining 2,110 sq ft will receive minor alterations and finish updates and will function as the sales floor. the project will also include limited exterior storefront modifications for the installation of new doors. approximately 5'x10' of existing sidewalk will be removed for new concrete loading ramp · 150 m away
- 3764 W Northwest HwyOct 27, 2020Erect attached sign · 150 m away
- 9490 Webb Chapel RdDec 3, 2025Gas test for gas meter release · 180 m away
- 9401 Webb Chapel RdSep 24, 2026Install new conduit for wayfinding kiosk · 193 m away
- 3780 W Northwest Hwy · Carroll Concerns Ltd PsJan 29, 2025Midway hollow pet clinic — renovation/alteration — interior renovation of the first floor of an existing veterinary hospital - to include a new interior layout with new interior finishes · 206 m away