9401 Webb Chapel Rd
Dallas, TX 75220
Permits add conduit for a wayfinding kiosk
Electrical permits at 9401 Webb Chapel Road cover underground power conduit and new conduit for a wayfinding kiosk. The City of Dallas records show filings on June 4 and September 24, 2026.
Summarized from City of Dallas records · updated Sep 24, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 24, 2026
- since Jun 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9401 Webb Chapel Rd
What is being built at 9401 Webb Chapel Road?
City of Dallas permits describe conduit work for a wayfinding kiosk: underground conduit for power and new conduit for the kiosk. The records do not specify whether the kiosk itself is being installed.
When were the permits filed for the wayfinding kiosk?
The City of Dallas filed commercial electrical permit COM-ELC-26-002431 on June 4, 2026, for underground power conduit. Permit COM-ELC-26-004810, filed September 24, 2026, covers new conduit for the kiosk.
Is a wayfinding kiosk being installed at 9401 Webb Chapel Road?
The permits describe conduit for a wayfinding kiosk, but do not confirm that the kiosk itself is being installed.
What is happening near Take 5 Oil Change on W Northwest Highway?
At 9401 Webb Chapel Road, about 222 meters from the Take 5 Oil Change location listed in nearby records, City of Dallas permits cover conduit for a wayfinding kiosk.
What work is planned near Goodwill on W Northwest Highway?
At 9401 Webb Chapel Road, about 343 meters from the Goodwill Store and Donation Center listed in nearby records, permits cover underground power conduit and new conduit for a wayfinding kiosk.
Also being built nearby
All of 75220- 9490 Webb Chapel RdDec 3, 2025Gas test for gas meter release · 49 m away
- 9410 Webb Chapel RdMay 13, 2026Walmart has requested that timberlyn perform an exterior lighting upgrade. walmart does this every 7 to 10 years. we will be replacing the existing led light fixture with a new, more efficient led fixture. timberlyn is only the labor source. acuity brands lighting is supplying all necessary materials and the photometrics. this site is getting a total of 97 fixtures installed, with 9 of them being new installations · 56 m away
- 9411 Webb Chapel RdOct 22, 2026New underground plumbing and grease trap. all new plumbing in walls and fixtures · 74 m away
- 3710 W Northwest HwyOct 16, 2025Commercial re-roof · 118 m away
- 9419 Webb Chapel RdJul 25, 2025Replaced (2)- 1/2” backflow preventers for ice maker machine · 132 m away
- 3701 W Northwest HwyAug 31, 2026Excavate and remove existing metal grease interceptorinstall new gb-75 grease interceptor and sv-10 sample well · 193 m away
- 3733 W Northwest HwyApr 14, 2026Replaced 3/4" rpz backflow preventer · 207 m away
- 3740 W Northwest HwyJun 10, 2026Demolish and remove building to slab level. site paving will remain · 213 m away
- 3767 W Northwest HwyOct 23, 2026Exp bu zo me pl a remodel for an existing auto repair facility to a quick service oil change · 222 m away
- 3767 Wnorthwest Pkwy · Leak Properties LtdOct 29, 2026Take 5 oil change - dallas (conversion) — renovation/alteration — remodels of exhausting repair facility · 222 m away
- 9337 Webb Chapel RdMay 21, 2025Original record in posse (2311013085) was in issued status and is pending inspections. needed to recreate the record in accela in order to allow for the final inspections to be scheduled and completed. installing conduit and power for trail lights and street lights · 277 m away
- 3760 W Northwest HwyNov 9, 2020Erect attached sign · 329 m away