3767 Wnorthwest Pkwy
Dallas, TX 75220 · Leak Properties Ltd
Take 5 Oil Change remodel planned at 3767 W Northwest Hwy
A 1,648-square-foot remodel to convert an existing auto repair facility to a quick-service oil change is registered at 3767 W Northwest Hwy. The TDLR project registration was filed October 29, 2026, under project number TABS2027004715; its estimated project cost is $250,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 29, 2026
- since Oct 29, 2026
- Largest scope
- 1,648 sf
- Estimated cost
- $250K
- state registration
Where this project stands
In state plan reviewTake 5 Oil Change - Dallas (conversion)
1,648 sq ft · $250K est.
- RegisteredOct 29, 2026
- Plan reviewnow
- ConstructionDec '26 – Jul '27
- Inspected
- Closed
Construction is scheduled to start Dec 1, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemodels of exhausting repair facility — take 5 oil change
TDLR project registrationRenovation/AlterationProject Registered1,648 sq ft$250K est.- Project #
- TABS2027004715
- Tenant / owner
- Take 5 Oil Change - Dallas (conversion)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3767 Wnorthwest Pkwy
What is being built at 3767 W Northwest Hwy?
A registered renovation would convert an existing auto repair facility into a Take 5 Oil Change location. The 1,648-square-foot project was registered with TDLR on October 29, 2026.
Is Take 5 Oil Change coming to 3767 W Northwest Hwy in Dallas?
A TDLR registration lists a Take 5 Oil Change conversion at the address. The registration does not provide an opening date.
How much will the Take 5 Oil Change project cost?
The TDLR registration lists an estimated project cost of $250,000. This is the applicant's estimate, not a reported final cost.
How large is the remodel at 3767 W Northwest Hwy?
The TDLR project registration lists the renovation area as 1,648 square feet.
What's being remodeled near Goodwill Store and Donation Center on W Northwest Hwy?
A Take 5 Oil Change conversion is registered at 3767 W Northwest Hwy, about 122 meters from the Goodwill Store and Donation Center remodel at 3764 W Northwest Hwy. The Take 5 project was registered October 29, 2026.
What's being planned near Chick-fil-A on W Northwest Hwy in Dallas?
A TDLR registration describes a remodel for a Take 5 Oil Change at 3767 W Northwest Hwy, about 308 meters from Chick-fil-A #3288 at 3820 W Northwest Hwy. The registration does not state when the location will open.
Also being built nearby
All of 75220- 3767 W Northwest HwyOct 23, 2026Exp bu zo me pl a remodel for an existing auto repair facility to a quick service oil change
- 3733 W Northwest HwyApr 14, 2026Replaced 3/4" rpz backflow preventer · 15 m away
- 3701 W Northwest HwyAug 31, 2026Excavate and remove existing metal grease interceptorinstall new gb-75 grease interceptor and sv-10 sample well · 29 m away
- 3740 W Northwest HwyJun 10, 2026Demolish and remove building to slab level. site paving will remain · 36 m away
- 3760 W Northwest HwyNov 9, 2020Erect attached sign · 108 m away
- 3710 W Northwest HwyOct 16, 2025Commercial re-roof · 121 m away
- 3764 W Northwest Hwy · Goodwill Industries Of Dallas Inc.Jun 30, 2026Zo bc this project consists of the remodel of an existing 4,085-sq ft tenant space. approximately 1,975 sq ft will undergo complete interior demolition and renovation to accomodate the new production/stockroom area. the remaining 2,110 sq ft will receive minor alterations and finish updates and will function as the sales floor. the project will also include limited exterior storefront modifications for the installation of new doors. approximately 5'x10' of existing sidewalk will be removed for new concrete loading ramp · 122 m away
- 3764 W Northwest HwyOct 27, 2020Erect attached sign · 122 m away
- 9410 Webb Chapel RdMay 13, 2026Walmart has requested that timberlyn perform an exterior lighting upgrade. walmart does this every 7 to 10 years. we will be replacing the existing led light fixture with a new, more efficient led fixture. timberlyn is only the labor source. acuity brands lighting is supplying all necessary materials and the photometrics. this site is getting a total of 97 fixtures installed, with 9 of them being new installations · 168 m away
- 3780 W Northwest Hwy · Carroll Concerns Ltd PsJan 29, 2025Midway hollow pet clinic — renovation/alteration — interior renovation of the first floor of an existing veterinary hospital - to include a new interior layout with new interior finishes · 178 m away
- 9490 Webb Chapel RdDec 3, 2025Gas test for gas meter release · 207 m away
- 9401 Webb Chapel RdSep 24, 2026Install new conduit for wayfinding kiosk · 222 m away