1718 Robert B Cullum Blvd
Dallas, TX 75210
Second-floor and roof addition at Irma Lerma Rangel school
City of Dallas permits indicate a second-floor and roof addition at Irma Lerma Rangel Young Women’s Leadership School, filed April 9, 2026. A separate permit filed March 2, 2026, covers security, lighting, fire alarm, and other building upgrades.
Summarized from City of Dallas records · updated Apr 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 9, 2026
- since Mar 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsDsst-disd irma lerma rangel young provide security updates, provide secure vestibule, replace fire alarm system, provide exterior lighting controls, replace exterior lighting with led. provide/replace idf/mdf ac. replace interior doors and hardware,. re-key entire faciity per district grand master keying system. provide new marquee sign. provide new room graphics and way finding. repair broken and cracked exterior wall cladding. perform mild detergent pressure wash on stained or mildewed facade. replace exterior waterproofing/sealant joints. remove and replace concrete pavement. remove and replace stucco soffit
Dsst-disd irma lerma rangel young provide security updates, provide secure vestibule, replace fire alarm system, provide exterior lighting controls, replace exterior lighting with led. provide/replace idf/mdf ac. replace interior doors and hardware,. re-key entire faciity per district grand master keying system. provide new marquee sign. provide new room graphics and way finding. repair broken and cracked exterior wall cladding. perform mild detergent pressure wash on stained or mildewed facade. replace exterior waterproofing/sealant joints. remove and replace concrete pavement. remove and replace stucco soffit
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1718 Robert B Cullum Blvd
What is being built at 1718 Robert B Cullum Blvd?
City of Dallas permit COM-PH-ALT-ADD-26-000153 describes a second-floor and roof addition at Irma Lerma Rangel Young Women’s Leadership School. It was filed April 9, 2026.
Is Irma Lerma Rangel Young Women’s Leadership School getting an addition?
A City of Dallas permit filed April 9, 2026, indicates a second-floor and roof addition at the school. The record does not provide a construction schedule.
What upgrades are planned at the school on Robert B Cullum Boulevard?
A permit filed March 2, 2026, lists security updates, a secure vestibule, a replacement fire alarm system, exterior lighting work, door and hardware replacements, and other repairs. The permit number is COM-ALT-ADD-25-001116.
When were permits filed for work at 1718 Robert B Cullum Blvd?
The City of Dallas records show filings on March 2, 2026, for building upgrades and April 9, 2026, for the second-floor and roof addition.
What’s happening near the Log Flume Area Redevelopment Plan?
At 1718 Robert B Cullum Blvd, about 397 meters from the Log Flume Area Redevelopment Plan, City of Dallas permits indicate school upgrades and a second-floor and roof addition. The addition permit was filed April 9, 2026.
Also being built nearby
All of 75210- 1715 Robert B. Cullum Blvd · Rocket PhillyOct 22, 2024Rocket philly restaurant — new construction — 5600sqft restaurant · 123 m away
- 1730 Jb Jackson Jr BlvdSep 5, 2025Added additional grounding and surge protector to panel.“ · 169 m away
- 3300 Martin Luther King Jr BlvdSep 12, 2025Exterior renovation to include new signage (under a separate permit), new bollards and very limited building paint. no interior work. no change in occupancy classification and occupant load. no civil, mechanical, electrical, or plumbing under this scope of work · 202 m away
- 4301 Pennsylvania AveApr 27, 2026Replacing the sanitary line for the restrooms (approximately 20ft). will be creating an access behind the storage room where we will tunnel to replace a portion of the sanitary for the restroom fixtures. will reset toilets and urinal to ensure they aren’t leaking when in use. install a clean out at the back of the building and a set of doubled clean outs at the front · 226 m away
- 3227 Pennsylvania AveJul 28, 2026Demolition existing structure \| 3227 pennsylvania · 233 m away
- 3223 Pennsylvania AveNov 10, 2026Bc el fire the scope of work consists of reusing the existing 11'-0" x 16'-0" concrete pad and extending it to 11'-0" x 22'-0". improvements include the installation of one 12'-0" h-frame, two span panels, four tesla powerwall 3 units, two tesla gateway 3 units, one charles fiber box (cube-m01818wb-a), one 200a meter in the existing meter box, one new meter box with a 200a meter, four nodes, and one ground bar. the project also includes installing conduit runs from the h-frame to the nodes and fiber handholes, with the final quantity of handholes to be determined by the contractor · 237 m away
- 3203 Pennsylvania Ave · Simple Faith InternationalMar 12, 2025Simple faith international — new construction — new construction of metal pre fabricated church building and parking lot · 259 m away
- 3203 Pennsylvania AveApr 1, 2026“installation of plumbing systems for a new commercial building, including domestic water distribution and sanitary wastewater piping throughout the structure. work includes connection to approved water and wastewater services per city of dallas standards and approved plans · 259 m away
- 3308 Birmingham AveAug 19, 2025Install 8' fence for privacy and security for property. (122 feet of 8' cedar picket) (135 feet of 6' wrought iron) · 265 m away
- 3700 Pennsylvania AveSep 24, 2025Pig races 2025 · 276 m away
- 3225 Martin Luther King Jr. Blvd · C World LLCFeb 21, 2024Vista mlk office suites — renovation/alteration — continued alteration of an (existing single story) office building, into a new office suites building. finish-out of (3) tenant office suites · 287 m away
- 1815 Jb Jackson Jr BlvdSep 25, 20261-8 consolidated dwelling 1-8 unit ** to be reviewed by com-zo & res-bu · 286 m away