2300 S Ravinia Dr
Dallas, TX 75211
Renovation work permitted at Stockard Middle School
City of Dallas permits indicate renovation work at Stockard Middle School, including a new vestibule and first- and second-floor HVAC and lighting work. The latest listed permit was filed November 18, 2026, for plumbing work described as “Renovation area rr's.”
Summarized from City of Dallas records · updated Nov 18, 2026
- Projects
- 13
- 13 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
13 projectsDsst-disd stockard middle school renovation of older portion of existing stockard middle school, including the following primary scopes of work; interior finish upgrades, renovated entry vestibule to be secure per disd standards, new entry steps/ramp, replacement of some exterior windows, new marquee sign, replacement of older, existing roofing material, partial replacement of existing hvac equipment, and new interior lighting upgrades to led
Dsst-disd stockard middle school renovation of older portion of existing stockard middle school, including the following primary scopes of work; interior finish upgrades, renovated entry vestibule to be secure per disd standards, new entry steps/ramp, replacement of some exterior windows, new marquee sign, replacement of older, existing roofing material, partial replacement of existing hvac equipment, and new interior lighting upgrades to led
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2300 S Ravinia Dr
What is being built at 2300 S Ravinia Dr?
City of Dallas permits indicate renovation work at Stockard Middle School, including a new vestibule and HVAC and lighting work on the first and second floors. The permits do not describe a new building.
Is Stockard Middle School getting a new entrance?
A June 30, 2026, permit describes a new vestibule at Stockard Middle School. The permit number is COM-PH-ALT-ADD-26-000329.
What renovations are planned for Stockard Middle School?
Permits describe a new vestibule, first- and second-floor HVAC and lighting work, site work, and electrical and plumbing remodeling. The records do not provide a full project schedule.
When was work at Stockard Middle School permitted?
The listed permits range from June 30 to November 18, 2026. The latest is plumbing permit COM-PLM-26-004477, filed November 18.
Are there electrical permits for Stockard Middle School?
Yes. The City of Dallas listed several commercial electrical permits on July 14, 2026, including COM-ELC-26-003146 for first-floor work and COM-ELC-26-003147 for second-floor work.
Also being built nearby
All of 75211- 2300 S. Ravinia Drive, Dallas, TX 75211 · Dallas Independent School District (dallas Isd)Jul 2, 2025Bond 2020 – org#059 l.v. stockard middle school — renovation/alteration — install secure entry vestibule, upgrade fire alarm system, add security cameras, card readers, and door sensors. renovate admin and clinic areas, refresh interior finishes in corridors and classrooms, and improve some amenities for accessibility
- 2906 Poinsettia DrJul 14, 2025Dig out and replace the main sewer lineadd double clean.outs on main sewer line · 102 m away
- 3015 Texas DrMay 21, 2026Photovoltaic roof mount system 18.450 kw dc roof mount solar pv system with 45 q.cells: q.peak duo blk ml-g10+ 410w pv modules with 45 enphase: iq8hc-72-m-dom-us [240v] microinverters · 137 m away
- 2842 Poinsettia DrDec 1, 2020Storm damage to service. electrical release · 169 m away
- 2845 Poinsettia DrMay 15, 2025Currently down on power · 173 m away
- 2841 Poinsettia DrJan 4, 2026Electrical service repairs due to tree falling on service drop wires ,, meter socket replace, riser mast replace · 180 m away
- 3046 Texas DrApr 15, 2026Replace metre base · 198 m away
- 2903 Dutton DrMar 9, 2026Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 214 m away
- 3026 Poinsettia DrJul 9, 2026Gas test · 219 m away
- 2927 Dutton DrAug 4, 2025Re roof only, no redeck. tear off 1 layer, install laminated shingles · 220 m away
- 2913 Rolinda DrMay 14, 2025Replace gas line in yard · 229 m away
- 2850 Dutton DrOct 27, 2026Nsfaa im renovating my current front house porch.there is a structure already there i’m going to renovate · 233 m away