2300 S. Ravinia Drive, Dallas, TX 75211
Dallas, TX 75211 · Dallas Independent School District (dallas Isd)
L.V. Stockard Middle School renovation registered in July 2025
A renovation at L.V. Stockard Middle School includes a secure entry vestibule, fire alarm upgrades, security cameras, card readers and door sensors, along with updates to the admin and clinic areas, corridors and classrooms. The project was registered with TDLR on July 2, 2025; the applicant estimated its cost at $9.654 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- 115,230 sf
- Estimated cost
- $9.7M
- state registration
Where this project stands
Finishing up · inspection nextBond 2020 – ORG#059 L.V. Stockard Middle School
115,230 sq ft · $9.7M est.
- RegisteredJul 2, 2025
- Plan review
- ConstructionNov '25 – Nov '26
- Inspectednow
- Closed
Scheduled to finish Nov 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInstall secure entry vestibule, upgrade fire alarm system, add security cameras, card readers, and door sensors. renovate admin and clinic areas, refresh interior finishes in corridors and classrooms, and improve some amenities for accessibility. — l.v. stockard middle school
TDLR project registrationRenovation/AlterationReview Complete115,230 sq ft$9.7M est.- Project #
- TABS2025022553
- Tenant / owner
- Bond 2020 – Org#059 L.v. Stockard Middle School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2300 S. Ravinia Drive, Dallas, TX 75211
What is being built at 2300 S. Ravinia Drive?
A renovation is planned at L.V. Stockard Middle School, including security upgrades and work in administrative, clinic, corridor and classroom areas. TDLR project registration TABS2025022553 was filed July 2, 2025.
Is a new school being built at 2300 S. Ravinia Drive?
The TDLR registration describes a renovation and alteration at L.V. Stockard Middle School, not a new school. The project is listed at 115,230 square feet.
What upgrades are planned at L.V. Stockard Middle School?
The project description includes a secure entry vestibule, fire alarm upgrades, security cameras, card readers and door sensors. It also describes renovations to the admin and clinic areas and refreshed finishes in corridors and classrooms.
How much will the L.V. Stockard Middle School project cost?
The applicant estimated the project cost at $9.654 million in the TDLR registration filed July 2, 2025.
When was the L.V. Stockard Middle School renovation filed?
The project was registered with the Texas Department of Licensing and Regulation on July 2, 2025. Its TDLR project number is TABS2025022553.
What accessibility work is planned at L.V. Stockard Middle School?
The project description says some amenities will be improved for accessibility. It does not specify which amenities.
Also being built nearby
All of 75211- 2300 S Ravinia DrNov 18, 2026Renovation area rr's
- 2906 Poinsettia DrJul 14, 2025Dig out and replace the main sewer lineadd double clean.outs on main sewer line · 102 m away
- 3015 Texas DrMay 21, 2026Photovoltaic roof mount system 18.450 kw dc roof mount solar pv system with 45 q.cells: q.peak duo blk ml-g10+ 410w pv modules with 45 enphase: iq8hc-72-m-dom-us [240v] microinverters · 137 m away
- 2842 Poinsettia DrDec 1, 2020Storm damage to service. electrical release · 169 m away
- 2845 Poinsettia DrMay 15, 2025Currently down on power · 173 m away
- 2841 Poinsettia DrJan 4, 2026Electrical service repairs due to tree falling on service drop wires ,, meter socket replace, riser mast replace · 180 m away
- 3046 Texas DrApr 15, 2026Replace metre base · 198 m away
- 2903 Dutton DrMar 9, 2026Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 214 m away
- 3026 Poinsettia DrJul 9, 2026Gas test · 219 m away
- 2927 Dutton DrAug 4, 2025Re roof only, no redeck. tear off 1 layer, install laminated shingles · 220 m away
- 2913 Rolinda DrMay 14, 2025Replace gas line in yard · 229 m away
- 2850 Dutton DrOct 27, 2026Nsfaa im renovating my current front house porch.there is a structure already there i’m going to renovate · 233 m away
More medical facilities in 75211, schools & daycares in 75211.