groundranger
Recent · latest filing Jun 2025Residential

3228 Emmett St

Dallas, TX 75211

3228 Emmett St: 1 project on record

City of Dallas lists 1 filing across 1 project at 3228 Emmett St, Dallas, TX 75211. The most recent, filed June 30, 2025, covers: “Gas pressure test”.

Compiled from City of Dallas records · updated Jun 30, 2025

Projects
1
1 filings
Latest filing
Jun 30, 2025
since Jun 30, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Gas pressure test

    Gas pressure test

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-002029
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 3228 Emmett St

What is being built at 3228 Emmett St?

The latest filing (City of Dallas permit RES-PLM-25-002029, June 30, 2025) covers gas pressure test.

How many permits and filings does 3228 Emmett St have?

1 filing across 1 project, from June 30, 2025 to June 30, 2025.

Is there other construction near 3228 Emmett St?

Yes. Nearby filings include 3220 Brandon St (gas test, Oct 15, 2025); 1207 S Westmoreland Rd (gas test, Feb 17, 2026); 1104 S Westmoreland Rd (prepare the existing roof system for recover by perforating the existing modified roof system every100 sq ft using a ¾" drill bit, remove any sediment and loose debris. • remove all marked areas of wet insulation that was found present during the moisture scan (approx 2,000 sq ft) all roofing wet insulation will be removed down to the metal deck and new 3" polyiso will be installed. • over the existing roof system furnish, mechanically attach a ½" hd polyiso cover board. all boards will be fastened @ 6 fasteners per 4'x8' board. • furnish and install new 10'x100' carlisle 60 mil tpo membrane. all membrane will be fastened using seam plates and hd fasteners all seams will be fastened @ 12" oc throughout the entire roof area. 2 wind rows will be installed at all perimeter edges at 5'oc. all wind rows will be fastened @ 12" oc. • remove the existing wall flashings and install and mechanically attached a new ¼" dens deck primed cover boards. adhere tpo membrane over dens deck and install new termination bar and counter flashings. • remove and discard 2 abandoned rail curbs and infill with new insulation to match existing roof height. • cover all vertical parapet wall joints with new reinforced, elastomeric three-course (mastic/fabric/mastic) flashing. new elastomeric flashing to extend from top of new surface-mounted counterflashing to the outside top edge of the parapet. mask both sides and extend new elastomeric flashing to approximately 3" past both edges of the panel joint or previously applied joint sealants/coatings, whichever is greater. • install new tpo coated l metal at the west parapet wall and vertical rising walls. mechanically attach metal flange through the new roof assembly at 4" oc using stainless steel, pan head screws • remove and replace 3 rows of the existing shingles where the shingle roof sections are tied in with the new tpo sections. all details will be installed per carlise detail u-13f • remove and replace all damaged shingles. (10 ea.). • furnish and install new leader heads, scuppers and downspouts using 24ga sheet metal (owner to select color). • furnish and install new tpo wall-pads at all service side of mechanical units and roof access points. • flash all curbs, pipes and penetrations per manufacture's specifications, Oct 15, 2025).

How do I get alerts for new permits at 3228 Emmett St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75211
Get alerts for 3228 Emmett St