1104 S Westmoreland Rd
Dallas, TX 75211
Roof recovery work permitted at 1104 S Westmoreland Rd
A commercial roofing permit covers work on the existing roof at 1104 S Westmoreland Rd. The City of Dallas permit, filed October 15, 2025, describes installing a new TPO membrane, replacing wet insulation and repairing shingle sections.
Summarized from City of Dallas records · updated Oct 15, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 15, 2025
- since Oct 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsPrepare the existing roof system for recover by perforating the existing modified roof system every100 sq ft using a ¾" drill bit, remove any sediment and loose debris. • remove all marked areas of wet insulation that was found present during the moisture scan (approx 2,000 sq ft) all roofing wet insulation will be removed down to the metal deck and new 3" polyiso will be installed. • over the existing roof system furnish, mechanically attach a ½" hd polyiso cover board. all boards will be fastened @ 6 fasteners per 4'x8' board. • furnish and install new 10'x100' carlisle 60 mil tpo membrane. all membrane will be fastened using seam plates and hd fasteners all seams will be fastened @ 12" oc throughout the entire roof area. 2 wind rows will be installed at all perimeter edges at 5'oc. all wind rows will be fastened @ 12" oc. • remove the existing wall flashings and install and mechanically attached a new ¼" dens deck primed cover boards. adhere tpo membrane over dens deck and install new termination bar and counter flashings. • remove and discard 2 abandoned rail curbs and infill with new insulation to match existing roof height. • cover all vertical parapet wall joints with new reinforced, elastomeric three-course (mastic/fabric/mastic) flashing. new elastomeric flashing to extend from top of new surface-mounted counterflashing to the outside top edge of the parapet. mask both sides and extend new elastomeric flashing to approximately 3" past both edges of the panel joint or previously applied joint sealants/coatings, whichever is greater. • install new tpo coated l metal at the west parapet wall and vertical rising walls. mechanically attach metal flange through the new roof assembly at 4" oc using stainless steel, pan head screws • remove and replace 3 rows of the existing shingles where the shingle roof sections are tied in with the new tpo sections. all details will be installed per carlise detail u-13f • remove and replace all damaged shingles. (10 ea.). • furnish and install new leader heads, scuppers and downspouts using 24ga sheet metal (owner to select color). • furnish and install new tpo wall-pads at all service side of mechanical units and roof access points. • flash all curbs, pipes and penetrations per manufacture's specifications
Prepare the existing roof system for recover by perforating the existing modified roof system every100 sq ft using a ¾" drill bit, remove any sediment and loose debris. • remove all marked areas of wet insulation that was found present during the moisture scan (approx 2,000 sq ft) all roofing wet insulation will be removed down to the metal deck and new 3" polyiso will be installed. • over the existing roof system furnish, mechanically attach a ½" hd polyiso cover board. all boards will be fastened @ 6 fasteners per 4'x8' board. • furnish and install new 10'x100' carlisle 60 mil tpo membrane. all membrane will be fastened using seam plates and hd fasteners all seams will be fastened @ 12" oc throughout the entire roof area. 2 wind rows will be installed at all perimeter edges at 5'oc. all wind rows will be fastened @ 12" oc. • remove the existing wall flashings and install and mechanically attached a new ¼" dens deck primed cover boards. adhere tpo membrane over dens deck and install new termination bar and counter flashings. • remove and discard 2 abandoned rail curbs and infill with new insulation to match existing roof height. • cover all vertical parapet wall joints with new reinforced, elastomeric three-course (mastic/fabric/mastic) flashing. new elastomeric flashing to extend from top of new surface-mounted counterflashing to the outside top edge of the parapet. mask both sides and extend new elastomeric flashing to approximately 3" past both edges of the panel joint or previously applied joint sealants/coatings, whichever is greater. • install new tpo coated l metal at the west parapet wall and vertical rising walls. mechanically attach metal flange through the new roof assembly at 4" oc using stainless steel, pan head screws • remove and replace 3 rows of the existing shingles where the shingle roof sections are tied in with the new tpo sections. all details will be installed per carlise detail u-13f • remove and replace all damaged shingles. (10 ea.). • furnish and install new leader heads, scuppers and downspouts using 24ga sheet metal (owner to select color). • furnish and install new tpo wall-pads at all service side of mechanical units and roof access points. • flash all curbs, pipes and penetrations per manufacture's specifications
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 1104 S Westmoreland Rd
What is being built at 1104 S Westmoreland Rd?
The permit describes work on the existing roof, not a new building. Plans include a new TPO membrane, replacement of wet insulation and repairs to shingle sections.
When was the roofing work permitted?
The City of Dallas issued a permit record dated October 15, 2025. The permit number is COM-ROOF-25-000147.
Is the roof being replaced at 1104 S Westmoreland Rd?
The permit describes recovering the existing roof with a new TPO membrane and replacing areas of wet insulation. It also calls for replacing damaged shingles and three rows where shingle sections meet the TPO sections.
Is a new restaurant opening at 1104 S Westmoreland Rd?
The available permit is for commercial roofing work. It does not identify a new restaurant or tenant.
Is this a new building or work on an existing property?
The permit describes repairs and upgrades to the existing roof, including new flashing, insulation and drainage components.
Also being built nearby
All of 75211- 3333 Thibet StSep 24, 2026Installed new hvac system · 78 m away
- 1207 S Westmoreland RdFeb 17, 2026Gas test · 125 m away
- 3328 W Clarendon DrMay 21, 2026Replacing entire roof · 141 m away
- 3307 W Clarendon DrJun 27, 2025Replace stove connector and test · 147 m away
- 3323 W Clarendon DrAug 4, 2026Replace existing gas line from gas meter and reconnect equipment as per code.replace existing water heater with a new one and bring up to code · 157 m away
- 3223 Aster StJun 29, 2026Gas test customer recently bought house and per atmos needed to have gas pressure test done and city inspection before they come out · 180 m away
- 3228 Emmett StJun 30, 2025Gas pressure test · 187 m away
- 3331 Ivandell AveJul 1, 2026Gas pressure test · 234 m away
- 1020 S Westmoreland RdAug 18, 2025Work order #153484perform backflow testing · 243 m away
- 3114 Aster StAug 10, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment.erie to furnish and install decking with osb where applicable · 260 m away
- 3121 Aster StDec 30, 2020Install new hvac · 261 m away
- 3343 Emmett StNov 26, 2025Re roofing shingles · 269 m away
More restaurants in 75211.