3307 W Clarendon Dr
Dallas, TX 75211
3307 W Clarendon Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 3307 W Clarendon Dr, Dallas, TX 75211. The most recent, filed June 27, 2025, covers: “Replace stove connector and test”.
Compiled from City of Dallas records · updated Jun 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2025
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3307 W Clarendon Dr
What is being built at 3307 W Clarendon Dr?
The latest filing (City of Dallas permit RES-PLM-25-001940, June 27, 2025) covers replace stove connector and test.
How many permits and filings does 3307 W Clarendon Dr have?
1 filing across 1 project, from June 27, 2025 to June 27, 2025.
Is there other construction near 3307 W Clarendon Dr?
Yes. Nearby filings include 3328 W Clarendon Dr (replacing entire roof, May 21, 2026); 3323 W Clarendon Dr (replace existing gas line from gas meter and reconnect equipment as per code.replace existing water heater with a new one and bring up to code, Aug 4, 2026); 3333 Thibet St (installed new hvac system, Sep 24, 2026).
How do I get alerts for new permits at 3307 W Clarendon Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75211- 3328 W Clarendon DrMay 21, 2026Replacing entire roof · 14 m away
- 3323 W Clarendon DrAug 4, 2026Replace existing gas line from gas meter and reconnect equipment as per code.replace existing water heater with a new one and bring up to code · 15 m away
- 3333 Thibet StSep 24, 2026Installed new hvac system · 99 m away
- 3331 Ivandell AveJul 1, 2026Gas pressure test · 111 m away
- 1104 S Westmoreland RdOct 15, 2025Prepare the existing roof system for recover by perforating the existing modified roof system every100 sq ft using a ¾" drill bit, remove any sediment and loose debris. • remove all marked areas of wet insulation that was found present during the moisture scan (approx 2,000 sq ft) all roofing wet insulation will be removed down to the metal deck and new 3" polyiso will be installed. • over the existing roof system furnish, mechanically attach a ½" hd polyiso cover board. all boards will be fastened @ 6 fasteners per 4'x8' board. • furnish and install new 10'x100' carlisle 60 mil tpo membrane. all membrane will be fastened using seam plates and hd fasteners all seams will be fastened @ 12" oc throughout the entire roof area. 2 wind rows will be installed at all perimeter edges at 5'oc. all wind rows will be fastened @ 12" oc. • remove the existing wall flashings and install and mechanically attached a new ¼" dens deck primed cover boards. adhere tpo membrane over dens deck and install new termination bar and counter flashings. • remove and discard 2 abandoned rail curbs and infill with new insulation to match existing roof height. • cover all vertical parapet wall joints with new reinforced, elastomeric three-course (mastic/fabric/mastic) flashing. new elastomeric flashing to extend from top of new surface-mounted counterflashing to the outside top edge of the parapet. mask both sides and extend new elastomeric flashing to approximately 3" past both edges of the panel joint or previously applied joint sealants/coatings, whichever is greater. • install new tpo coated l metal at the west parapet wall and vertical rising walls. mechanically attach metal flange through the new roof assembly at 4" oc using stainless steel, pan head screws • remove and replace 3 rows of the existing shingles where the shingle roof sections are tied in with the new tpo sections. all details will be installed per carlise detail u-13f • remove and replace all damaged shingles. (10 ea.). • furnish and install new leader heads, scuppers and downspouts using 24ga sheet metal (owner to select color). • furnish and install new tpo wall-pads at all service side of mechanical units and roof access points. • flash all curbs, pipes and penetrations per manufacture's specifications · 147 m away
- 1020 S Westmoreland RdAug 18, 2025Work order #153484perform backflow testing · 158 m away
- 3223 Aster StJun 29, 2026Gas test customer recently bought house and per atmos needed to have gas pressure test done and city inspection before they come out · 185 m away
- 3338 Burlingdell AveFeb 13, 2026Gas test with gas release · 205 m away
- 3326 Burlingdell AveOct 10, 2025Replace 200a meter base, surge and upgrade grounding · 206 m away
- 3319 Burlingdell AveJul 7, 2026Install new panel & meter · 220 m away
- 1207 S Westmoreland RdFeb 17, 2026Gas test · 246 m away
- 3121 Aster StDec 30, 2020Install new hvac · 303 m away