3323 W Clarendon Dr
Dallas, TX 75211
Gas line and water heater work permitted at Dallas home
Residential permits at 3323 W Clarendon Dr cover replacing a gas line and water heater, filed Aug. 4, 2026. A July 20, 2026 permit covers a gas test and repairs, and an Aug. 5, 2025 permit lists an electrical service upgrade.
Summarized from City of Dallas records · updated Aug 4, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 4, 2026
- since Aug 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsReplace existing gas line from gas meter and reconnect equipment as per code.replace existing water heater with a new one and bring up to code
Replace existing gas line from gas meter and reconnect equipment as per code.replace existing water heater with a new one and bring up to code
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 3323 W Clarendon Dr
What is being built at 3323 W Clarendon Dr?
The records describe residential plumbing and electrical work, not a new building. The latest permit covers replacing a gas line and water heater.
Is there new construction planned at 3323 W Clarendon Dr?
The available permits do not indicate new construction. They describe gas, water heater and electrical service work.
What work does the latest permit cover at 3323 W Clarendon Dr?
Permit RES-PLM-26-008086, filed Aug. 4, 2026, covers replacing the existing gas line from the meter, reconnecting equipment to code and replacing the water heater.
When was gas work permitted at 3323 W Clarendon Dr?
A gas test and repair permit, RES-PLM-26-007477, was filed July 20, 2026. Another permit for gas line replacement and a new water heater was filed Aug. 4, 2026.
Was electrical work permitted at 3323 W Clarendon Dr?
Yes. City of Dallas permit RES-ELC-25-001951, filed Aug. 5, 2025, lists an electrical service upgrade.
Also being built nearby
All of 75211- 3307 W Clarendon DrJun 27, 2025Replace stove connector and test · 15 m away
- 3328 W Clarendon DrMay 21, 2026Replacing entire roof · 16 m away
- 3333 Thibet StSep 24, 2026Installed new hvac system · 103 m away
- 3331 Ivandell AveJul 1, 2026Gas pressure test · 114 m away
- 1104 S Westmoreland RdOct 15, 2025Prepare the existing roof system for recover by perforating the existing modified roof system every100 sq ft using a ¾" drill bit, remove any sediment and loose debris. • remove all marked areas of wet insulation that was found present during the moisture scan (approx 2,000 sq ft) all roofing wet insulation will be removed down to the metal deck and new 3" polyiso will be installed. • over the existing roof system furnish, mechanically attach a ½" hd polyiso cover board. all boards will be fastened @ 6 fasteners per 4'x8' board. • furnish and install new 10'x100' carlisle 60 mil tpo membrane. all membrane will be fastened using seam plates and hd fasteners all seams will be fastened @ 12" oc throughout the entire roof area. 2 wind rows will be installed at all perimeter edges at 5'oc. all wind rows will be fastened @ 12" oc. • remove the existing wall flashings and install and mechanically attached a new ¼" dens deck primed cover boards. adhere tpo membrane over dens deck and install new termination bar and counter flashings. • remove and discard 2 abandoned rail curbs and infill with new insulation to match existing roof height. • cover all vertical parapet wall joints with new reinforced, elastomeric three-course (mastic/fabric/mastic) flashing. new elastomeric flashing to extend from top of new surface-mounted counterflashing to the outside top edge of the parapet. mask both sides and extend new elastomeric flashing to approximately 3" past both edges of the panel joint or previously applied joint sealants/coatings, whichever is greater. • install new tpo coated l metal at the west parapet wall and vertical rising walls. mechanically attach metal flange through the new roof assembly at 4" oc using stainless steel, pan head screws • remove and replace 3 rows of the existing shingles where the shingle roof sections are tied in with the new tpo sections. all details will be installed per carlise detail u-13f • remove and replace all damaged shingles. (10 ea.). • furnish and install new leader heads, scuppers and downspouts using 24ga sheet metal (owner to select color). • furnish and install new tpo wall-pads at all service side of mechanical units and roof access points. • flash all curbs, pipes and penetrations per manufacture's specifications · 157 m away
- 1020 S Westmoreland RdAug 18, 2025Work order #153484perform backflow testing · 167 m away
- 3223 Aster StJun 29, 2026Gas test customer recently bought house and per atmos needed to have gas pressure test done and city inspection before they come out · 200 m away
- 3338 Burlingdell AveFeb 13, 2026Gas test with gas release · 206 m away
- 3326 Burlingdell AveOct 10, 2025Replace 200a meter base, surge and upgrade grounding · 208 m away
- 3319 Burlingdell AveJul 7, 2026Install new panel & meter · 223 m away
- 1207 S Westmoreland RdFeb 17, 2026Gas test · 251 m away
- 818 Coombs Creek DrJan 30, 2026Electric remodel · 298 m away