3223 Aster St
Dallas, TX 75211
Electrical service upgrade and gas pressure test at 3223 Aster St
City of Dallas permits indicate residential electrical and plumbing work at 3223 Aster St, not a new building. An electrical service upgrade to 150 amps was permitted January 21, 2026, and a gas pressure test with a city inspection was permitted June 29, 2026.
Summarized from City of Dallas records · updated Jun 29, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 29, 2026
- since Jan 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsGas test customer recently bought house and per atmos needed to have gas pressure test done and city inspection before they come out
Gas test customer recently bought house and per atmos needed to have gas pressure test done and city inspection before they come out
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 3223 Aster St
What is being built at 3223 Aster St, Dallas?
The City of Dallas records show residential work at the address: an electrical service upgrade and a gas pressure test. They do not indicate new construction.
Is a new house being built at 3223 Aster St?
The permits listed are for work at an existing residence, not construction of a new house. They cover an electrical service upgrade and a gas pressure test.
What electrical work was permitted at 3223 Aster St?
A residential electrical permit for a 150-amp service upgrade was filed January 21, 2026. The permit number is RES-ELC-26-000398.
Why was a gas pressure test permitted at 3223 Aster St?
The permit description says a customer who recently bought the house needed a gas pressure test and city inspection before Atmos would come out. The residential plumbing permit was filed June 29, 2026, under number RES-PLM-26-006666.
When were permits filed for work at 3223 Aster St in Dallas?
The electrical permit was filed January 21, 2026, and the residential plumbing permit for the gas test was filed June 29, 2026.
Also being built nearby
All of 75211- 3121 Aster StDec 30, 2020Install new hvac · 120 m away
- 1020 S Westmoreland RdAug 18, 2025Work order #153484perform backflow testing · 123 m away
- 3114 Aster StAug 10, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment.erie to furnish and install decking with osb where applicable · 128 m away
- 3102 Aster StJan 28, 2021Install roofing mountage solar panels · 142 m away
- 3102 Ivandell AveDec 1, 2025Replace gas line in yard · 169 m away
- 3331 Ivandell AveJul 1, 2026Gas pressure test · 172 m away
- 1104 S Westmoreland RdOct 15, 2025Prepare the existing roof system for recover by perforating the existing modified roof system every100 sq ft using a ¾" drill bit, remove any sediment and loose debris. • remove all marked areas of wet insulation that was found present during the moisture scan (approx 2,000 sq ft) all roofing wet insulation will be removed down to the metal deck and new 3" polyiso will be installed. • over the existing roof system furnish, mechanically attach a ½" hd polyiso cover board. all boards will be fastened @ 6 fasteners per 4'x8' board. • furnish and install new 10'x100' carlisle 60 mil tpo membrane. all membrane will be fastened using seam plates and hd fasteners all seams will be fastened @ 12" oc throughout the entire roof area. 2 wind rows will be installed at all perimeter edges at 5'oc. all wind rows will be fastened @ 12" oc. • remove the existing wall flashings and install and mechanically attached a new ¼" dens deck primed cover boards. adhere tpo membrane over dens deck and install new termination bar and counter flashings. • remove and discard 2 abandoned rail curbs and infill with new insulation to match existing roof height. • cover all vertical parapet wall joints with new reinforced, elastomeric three-course (mastic/fabric/mastic) flashing. new elastomeric flashing to extend from top of new surface-mounted counterflashing to the outside top edge of the parapet. mask both sides and extend new elastomeric flashing to approximately 3" past both edges of the panel joint or previously applied joint sealants/coatings, whichever is greater. • install new tpo coated l metal at the west parapet wall and vertical rising walls. mechanically attach metal flange through the new roof assembly at 4" oc using stainless steel, pan head screws • remove and replace 3 rows of the existing shingles where the shingle roof sections are tied in with the new tpo sections. all details will be installed per carlise detail u-13f • remove and replace all damaged shingles. (10 ea.). • furnish and install new leader heads, scuppers and downspouts using 24ga sheet metal (owner to select color). • furnish and install new tpo wall-pads at all service side of mechanical units and roof access points. • flash all curbs, pipes and penetrations per manufacture's specifications · 180 m away
- 3307 W Clarendon DrJun 27, 2025Replace stove connector and test · 185 m away
- 3328 W Clarendon DrMay 21, 2026Replacing entire roof · 194 m away
- 3323 W Clarendon DrAug 4, 2026Replace existing gas line from gas meter and reconnect equipment as per code.replace existing water heater with a new one and bring up to code · 200 m away
- 3333 Thibet StSep 24, 2026Installed new hvac system · 215 m away
- 3326 Burlingdell AveOct 10, 2025Replace 200a meter base, surge and upgrade grounding · 221 m away