3407 Canyon Bluff Blvd
Dallas, TX 75211 · Corinth Canyon Bluff LLC
Restaurant shell and Chipotle finish-out permitted in Dallas
Dallas permits describe construction of a restaurant shell with drive-in or drive-through service at 3407 Canyon Bluff Blvd, with the initial new-construction permit filed January 6, 2026. A March 3 alteration permit identifies a first-time tenant finish-out for a Chipotle Mexican Grill restaurant; later permits cover plumbing, electrical work, paving and HVAC.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated May 6, 2026
- Projects
- 11
- 11 filings
- Latest filing
- May 6, 2026
- since Aug 28, 2025
- Largest scope
- 2,325 sf
- Estimated cost
- $1.1M
- state registration
Permit & project history
11 projectsMcr first time tenant finish out of an existing shell to a chipotle mexican grill restaurant
Mcr first time tenant finish out of an existing shell to a chipotle mexican grill restaurant
City of Dallas permitCommercial Alteration Addition PermitInstall new plumbing for a new restaurant, grease trap included.we will install onsite utilities as well
Install new plumbing for a new restaurant, grease trap included.we will install onsite utilities as well
City of Dallas permitCommercial Plumbing PermitQteam meeting 10.2.2025 (am) construction of a shell building for a restaurant with drive in or drive through service
Qteam meeting 10.2.2025 (am) construction of a shell building for a restaurant with drive in or drive through service
City of Dallas permitCommercial New Construction PermitScope of work is for a new 2,325 sq ft shell building. — chipotle shell building
TDLR project registrationNew ConstructionReview Complete2,325 sq ft$1.1M est.- Project #
- TABS2025026945
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 3407 Canyon Bluff Blvd
What is being built at 3407 Canyon Bluff Blvd?
City permits describe a restaurant shell with drive-in or drive-through service. A March 3, 2026 alteration permit identifies a Chipotle Mexican Grill tenant finish-out.
Is a Chipotle coming to 3407 Canyon Bluff Blvd in Dallas?
A Dallas alteration permit filed March 3, 2026, describes a first-time tenant finish-out of the existing shell for a Chipotle Mexican Grill restaurant. The records do not give an opening date.
When was the restaurant project permitted?
The new-construction permit, COM-NEW-25-000168, was filed January 6, 2026. Additional project permits were filed through May 6, 2026.
Will the restaurant have a drive-through?
The January 6, 2026 new-construction permit describes a restaurant shell with drive-in or drive-through service.
What work is listed in the permits for 3407 Canyon Bluff Blvd?
Records include restaurant plumbing, electrical work, paving, HVAC and 148 linear feet of stone retaining walls. The permits were filed between January 6 and May 6, 2026.
What is being built near Chavez on Westmoreland Road?
At 3407 Canyon Bluff Blvd, permits describe a restaurant shell with drive-through service and a Chipotle Mexican Grill tenant finish-out. Chavez is listed as a nearby landmark.
Also being built nearby
All of 75211- 3333 Canyon Bluff BlvdJul 23, 2026Quote is to replace lennox rtu 2 (s/n - 5618a05557). once the deposit has been received, we will order the new unit and begin the permit process · 152 m away
- 3500 W Colorado BlvdSep 23, 2026Electrical work to replace main breaker in building 3 panel. 2 · 192 m away
- 1500 N Westmoreland Rd · Qt South, LLCMar 26, 2026Relocate 7 circuits for fountain drinks machine · 306 m away
- 1903 N Westmoreland RdJul 13, 2026Qteam meeting 8.11.26 (9 am) - new office warehouse building and site improvements · 369 m away
- 1905 Westmoreland RoadAug 12, 2026Chavez — new construction — 5200 square feet of commercial property · 370 m away
- 3600 Dallas Ft Worth TpkeJul 20, 2026Qteam meeting 8.18.26 (1:30 pm) - new financial institution · 392 m away
- 1400 N Westmoreland RdJun 20, 2025Gas test · 393 m away
- 3242 Remond DrSep 8, 2025Generator · 440 m away
- 3234 Remond DrSep 6, 2024The conference center is a two-story building. the top floor has a large conference room with a connected balcony that overlooks the hillside. it also includes a vestibule, restroom and janitor closet. the bottom floor is a mechanical room. the exterior of the building is made up of pre-salvaged brick from the existing buildings. there is a clerestory pitched roof design · 446 m away
- 3011 Dallas Ft Worth TpkeNov 5, 2026Nstall 64' of 24" rcp at entry way and 540' of storm drain inside the property. install 1-2" irrigation and 1-2" domestic service · 448 m away
- 3230 Remond DrSep 10, 2025Generator · 448 m away
- 3500 Dallas Ft Worth TpkeJul 29, 2026Repull secondary conductors from transformer to main disconnect and from disconnect to mdp · 456 m away