3600 Dallas Ft Worth Tpke
Dallas, TX 75211
Permit filed for a new financial institution in Dallas
A commercial new-construction permit for a new financial institution was filed at 3600 Dallas Ft Worth Tpke on July 20, 2026. The City of Dallas record does not name an operator or provide a project size or construction schedule.
Summarized from City of Dallas records · updated Jul 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 20, 2026
- since Jul 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3600 Dallas Ft Worth Tpke
What is being built at 3600 Dallas Ft Worth Tpke?
A City of Dallas commercial new-construction permit describes the project as a new financial institution. The record does not identify an operator.
When was the permit filed for 3600 Dallas Ft Worth Tpke?
The permit was filed on July 20, 2026. Its number is COM-NEW-26-000239.
Is a new financial institution planned near Rudoph Foods Phase 1-3?
A permit for a new financial institution was filed at 3600 Dallas Ft Worth Tpke, about 313 meters from Rudoph Foods Phase 1-3 at 3660 Pipestone.
Which financial institution is planned at 3600 Dallas Ft Worth Tpke?
The permit description says “new financial institution” but does not name the institution.
When is the new financial institution opening in Dallas?
The permit record does not give an opening date or construction schedule.
Also being built nearby
All of 75211- 3615 Pipestone RdMar 11, 2026102,240 sq ft - prepare roof for recover application. mechanically fasten 1.5" iso to existing roof. mechanically fasten 60 mil tpo membrane.*no structrual changes*building is occupied · 212 m away
- 3522 La Reunion PkwyJun 17, 2025Install pallet rack in existing building · 307 m away
- 3660 Pipestone RdJan 14, 2026Install hvac upgrades for production and packaging area · 313 m away
- 3660 Pipestone Road · St Germain Holdings LtdApr 22, 2025Rudolph foods - oms expansion — renovation/alteration — new hvac, walkable imp ceiling, paint finishes, new rollup doors, new lighting (area of work approx 16000 sq ft) · 313 m away
- 3660 Pipestone · St. Germain Holdings LtdMar 17, 2026Rudoph foods phase 1-3 — renovation/alteration — interior insulated metal panel walls, replace (3) high speed doors, insulated metal panel ceiling, metal panel wall skins · 313 m away
- 3636 La Reunion PkwyMar 25, 2026Replace 1.5" double check valve on irrigation system · 331 m away
- 3702 La Reunion PkwyJun 22, 2026Installing 307 lf of 6ft chain link fencing with a 30' roll/slide gate, 2 - 4ft pedestrian gates · 380 m away
- 3500 W Colorado BlvdSep 23, 2026Electrical work to replace main breaker in building 3 panel. 2 · 380 m away
- 3407 Canyon Bluff Blvd · Corinth Canyon Bluff LLCMay 6, 2026Install hvac · 392 m away
- 3700 Pipestone RdMay 22, 2025Clean & showcorrecting previous work without a permit add new personnel exit door infill opening in existing demising wall provide new 3'0"x7'0" hm door to existing demolition existing gyp bd partition · 477 m away
- 1903 N Westmoreland RdJul 13, 2026Qteam meeting 8.11.26 (9 am) - new office warehouse building and site improvements · 527 m away
- 1905 Westmoreland RoadAug 12, 2026Chavez — new construction — 5200 square feet of commercial property · 528 m away