3615 Pipestone Rd
Dallas, TX 75212
Roof-recover work and sewer repiping at 3615 Pipestone Rd
Permits indicate roof-recover work on an existing commercial building and sewer repiping at 3615 Pipestone Rd. The sewer permit was filed June 10, 2025, and the roofing permit was filed March 11, 2026.
Summarized from City of Dallas records · updated Mar 11, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Mar 11, 2026
- since Jun 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projects102,240 sq ft - prepare roof for recover application. mechanically fasten 1.5" iso to existing roof. mechanically fasten 60 mil tpo membrane.*no structrual changes*building is occupied
102,240 sq ft - prepare roof for recover application. mechanically fasten 1.5" iso to existing roof. mechanically fasten 60 mil tpo membrane.*no structrual changes*building is occupied
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 3615 Pipestone Rd
What is being built at 3615 Pipestone Rd in Dallas?
The permits describe sewer repiping and work to prepare the existing roof for a recover application. They do not indicate a new building.
Is a new building going up at 3615 Pipestone Rd?
The available permits describe work on an existing building: sewer repiping and roof-recover work. The roofing permit says there are no structural changes.
What roof work is planned at 3615 Pipestone Rd?
Permit COM-ROOF-26-000062, filed March 11, 2026, describes mechanically fastening 1.5-inch insulation and a 60-mil TPO membrane over the existing roof. The permit description covers 102,240 square feet.
When were permits filed for 3615 Pipestone Rd?
The commercial plumbing permit for sewer repiping was filed June 10, 2025 (COM-PLM-25-000376). The commercial roofing permit was filed March 11, 2026 (COM-ROOF-26-000062).
What is happening near Rudoph Foods Phase 1-3 on Pipestone?
At 3615 Pipestone Rd, permits indicate sewer repiping and roof-recover work on an existing commercial building. The address is about 183 meters from Rudoph Foods Phase 1-3 at 3660 Pipestone.
Also being built nearby
All of 75212- 3636 La Reunion PkwyMar 25, 2026Replace 1.5" double check valve on irrigation system · 119 m away
- 3522 La Reunion PkwyJun 17, 2025Install pallet rack in existing building · 163 m away
- 3702 La Reunion PkwyJun 22, 2026Installing 307 lf of 6ft chain link fencing with a 30' roll/slide gate, 2 - 4ft pedestrian gates · 175 m away
- 3660 Pipestone RdJan 14, 2026Install hvac upgrades for production and packaging area · 183 m away
- 3660 Pipestone Road · St Germain Holdings LtdApr 22, 2025Rudolph foods - oms expansion — renovation/alteration — new hvac, walkable imp ceiling, paint finishes, new rollup doors, new lighting (area of work approx 16000 sq ft) · 183 m away
- 3660 Pipestone · St. Germain Holdings LtdMar 17, 2026Rudoph foods phase 1-3 — renovation/alteration — interior insulated metal panel walls, replace (3) high speed doors, insulated metal panel ceiling, metal panel wall skins · 183 m away
- 3600 Dallas Ft Worth TpkeJul 20, 2026Qteam meeting 8.18.26 (1:30 pm) - new financial institution · 212 m away
- 3700 Pipestone RdMay 22, 2025Clean & showcorrecting previous work without a permit add new personnel exit door infill opening in existing demising wall provide new 3'0"x7'0" hm door to existing demolition existing gyp bd partition · 352 m away
- 2104 French Settlement RdNov 3, 2026Bu zo the scope of work consists of installing a new pallet racking system inside an existing warehouse facility. the project includes the installation of 72 bays measuring 108" x 28" and 8 bays measuring 156" x 28", for a total of 936 pallet positions. the racking footprint covers approximately 1,755 square feet of floor area. work includes anchoring uprights to the existing concrete slab, assembling beams, wire decking, and all structural components in accordance with the stamped engineering plans and calculations. no modifications will be made to the building’s structural, electrical, mechanical, or plumbing systems. all installation will be performed by an insured and qualified crew following osha safety standards and manufacturer specifications. the racking system will be used for high?pile storage as defined by the fire code · 439 m away
- 2140 French Settlement RdNov 25, 2025Inspection of gas lines for gas service re-instatement · 471 m away
- 2150 French Settlement RdMar 4, 2026Gas test · 481 m away
- 2150 French Settlement · 2130-2150 French Owner LPApr 25, 2024Interior renovation for a spec office for rockhill management, llc — renovation/alteration — interior renovation of an existing office/warehouse facility · 481 m away