3660 Pipestone
Dallas, TX 75212 · St. Germain Holdings Ltd
Rudoph Foods renovation adds insulated panels and replaces doors
A 48,479-square-foot renovation at 3660 Pipestone includes insulated metal panel walls and ceiling, wall skins, and replacement of three high-speed doors. The TDLR project registration was filed March 17, 2026; the applicant’s estimated project cost is $4 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 17, 2026
- since Mar 17, 2026
- Largest scope
- 48,479 sf
- Estimated cost
- $4.0M
- state registration
Where this project stands
Inspected · closing outRudoph Foods Phase 1-3
48,479 sq ft · $4.0M est.
- RegisteredMar 17, 2026
- Plan review
- ConstructionMay '25 – Jan '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior insulated metal panel walls, replace (3) high speed doors, insulated metal panel ceiling, metal panel wall skins, — rudolph foods
TDLR project registrationRenovation/AlterationInspection Complete48,479 sq ft$4.0M est.- Project #
- TABS2026015133
- Tenant / owner
- Rudoph Foods Phase 1-3
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3660 Pipestone
What is being built at 3660 Pipestone in Dallas?
A renovation for Rudoph Foods Phase 1-3 is registered at the address, covering insulated metal panel walls and ceiling, wall skins, and replacement of three high-speed doors. The 48,479-square-foot project is listed as an alteration.
When was the Rudoph Foods project at 3660 Pipestone permitted?
The TDLR registration, project TABS2026015133, was filed March 17, 2026. The record lists its status as Inspection Complete.
How much will the 3660 Pipestone renovation cost?
The applicant estimated the project cost at $4 million in the TDLR registration. This is an estimate for the project, not a reported final cost.
How large is the Rudoph Foods renovation in Dallas?
The TDLR registration lists the project at 48,479 square feet. The work includes interior insulated metal panel walls and ceiling, metal panel wall skins, and three replacement high-speed doors.
What's being renovated near Turnpike 25 Parking Expansion?
Rudoph Foods Phase 1-3 is registered for renovation at 3660 Pipestone, about 515 meters from Turnpike 25 Parking Expansion at 2322 French Settlement Road. The TDLR filing is dated March 17, 2026.
Also being built nearby
All of 75212- 3660 Pipestone RdJan 14, 2026Install hvac upgrades for production and packaging area
- 3660 Pipestone Road · St Germain Holdings LtdApr 22, 2025Rudolph foods - oms expansion — renovation/alteration — new hvac, walkable imp ceiling, paint finishes, new rollup doors, new lighting (area of work approx 16000 sq ft)
- 3702 La Reunion PkwyJun 22, 2026Installing 307 lf of 6ft chain link fencing with a 30' roll/slide gate, 2 - 4ft pedestrian gates · 161 m away
- 3700 Pipestone RdMay 22, 2025Clean & showcorrecting previous work without a permit add new personnel exit door infill opening in existing demising wall provide new 3'0"x7'0" hm door to existing demolition existing gyp bd partition · 174 m away
- 3615 Pipestone RdMar 11, 2026102,240 sq ft - prepare roof for recover application. mechanically fasten 1.5" iso to existing roof. mechanically fasten 60 mil tpo membrane.*no structrual changes*building is occupied · 183 m away
- 3636 La Reunion PkwyMar 25, 2026Replace 1.5" double check valve on irrigation system · 186 m away
- 3600 Dallas Ft Worth TpkeJul 20, 2026Qteam meeting 8.18.26 (1:30 pm) - new financial institution · 313 m away
- 3522 La Reunion PkwyJun 17, 2025Install pallet rack in existing building · 332 m away
- 2104 French Settlement RdNov 3, 2026Bu zo the scope of work consists of installing a new pallet racking system inside an existing warehouse facility. the project includes the installation of 72 bays measuring 108" x 28" and 8 bays measuring 156" x 28", for a total of 936 pallet positions. the racking footprint covers approximately 1,755 square feet of floor area. work includes anchoring uprights to the existing concrete slab, assembling beams, wire decking, and all structural components in accordance with the stamped engineering plans and calculations. no modifications will be made to the building’s structural, electrical, mechanical, or plumbing systems. all installation will be performed by an insured and qualified crew following osha safety standards and manufacturer specifications. the racking system will be used for high?pile storage as defined by the fire code · 390 m away
- 2140 French Settlement RdNov 25, 2025Inspection of gas lines for gas service re-instatement · 435 m away
- 3801-3845 La Reunion Parkway · Pinnacle 3May 12, 2025400-source logistics — renovation/alteration — tenant improvements within existing shell building · 436 m away
- 3845 La Reunion PkwyDec 10, 2025No, work is being done we are trying to get electricity restored · 436 m away