3522 La Reunion Pkwy
Dallas, TX 75212
Pallet rack installation permitted at 3522 La Reunion Pkwy
A permit indicates pallet rack will be installed inside an existing building at 3522 La Reunion Pkwy. The City of Dallas issued the commercial alteration and addition permit on June 17, 2025.
Summarized from City of Dallas records · updated Jun 17, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jun 17, 2025
- since Nov 23, 2020
- Largest scope
- —
- Listed value
- $16K
- partial · often understated
Permit & project history
3 projectsSources: City of Dallas
Questions about 3522 La Reunion Pkwy
What is being built at 3522 La Reunion Pkwy?
A City of Dallas permit describes installing pallet rack inside an existing building. It does not identify a new building or a tenant.
When was the pallet rack permit filed?
The City of Dallas permit, COM-ALT-ADD-25-000311, was filed on June 17, 2025.
Is a new building being constructed at 3522 La Reunion Pkwy?
The permit describes work inside an existing building: installing pallet rack. It does not indicate new building construction.
What's going in near Rudolph Foods Phase 1-3?
A permit at 3522 La Reunion Pkwy, about 332 meters from Rudolph Foods Phase 1-3, indicates pallet rack installation inside an existing building.
What work is planned at 3522 La Reunion Pkwy in Dallas?
The permitted work is installation of pallet rack in an existing building. The City of Dallas record was filed June 17, 2025.
Also being built nearby
All of 75212- 3615 Pipestone RdMar 11, 2026102,240 sq ft - prepare roof for recover application. mechanically fasten 1.5" iso to existing roof. mechanically fasten 60 mil tpo membrane.*no structrual changes*building is occupied · 163 m away
- 3636 La Reunion PkwyMar 25, 2026Replace 1.5" double check valve on irrigation system · 174 m away
- 3702 La Reunion PkwyJun 22, 2026Installing 307 lf of 6ft chain link fencing with a 30' roll/slide gate, 2 - 4ft pedestrian gates · 246 m away
- 3600 Dallas Ft Worth TpkeJul 20, 2026Qteam meeting 8.18.26 (1:30 pm) - new financial institution · 307 m away
- 3660 Pipestone Road · St Germain Holdings LtdApr 22, 2025Rudolph foods - oms expansion — renovation/alteration — new hvac, walkable imp ceiling, paint finishes, new rollup doors, new lighting (area of work approx 16000 sq ft) · 332 m away
- 3660 Pipestone · St. Germain Holdings LtdMar 17, 2026Rudoph foods phase 1-3 — renovation/alteration — interior insulated metal panel walls, replace (3) high speed doors, insulated metal panel ceiling, metal panel wall skins · 332 m away
- 3660 Pipestone RdJan 14, 2026Install hvac upgrades for production and packaging area · 332 m away
- 2210 St Germain RdAug 8, 2025Replaced 50-gallon electric water heater · 402 m away
- 2104 French Settlement RdNov 3, 2026Bu zo the scope of work consists of installing a new pallet racking system inside an existing warehouse facility. the project includes the installation of 72 bays measuring 108" x 28" and 8 bays measuring 156" x 28", for a total of 936 pallet positions. the racking footprint covers approximately 1,755 square feet of floor area. work includes anchoring uprights to the existing concrete slab, assembling beams, wire decking, and all structural components in accordance with the stamped engineering plans and calculations. no modifications will be made to the building’s structural, electrical, mechanical, or plumbing systems. all installation will be performed by an insured and qualified crew following osha safety standards and manufacturer specifications. the racking system will be used for high?pile storage as defined by the fire code · 452 m away
- 2140 French Settlement RdNov 25, 2025Inspection of gas lines for gas service re-instatement · 470 m away
- 2150 French Settlement · 2130-2150 French Owner LPApr 25, 2024Interior renovation for a spec office for rockhill management, llc — renovation/alteration — interior renovation of an existing office/warehouse facility · 475 m away
- 2150 French Settlement RdMar 4, 2026Gas test · 475 m away