3700 Pipestone Rd
Dallas, TX 75212
Exit door and partition work permitted at 3700 Pipestone
A City of Dallas commercial alteration permit indicates work at 3700 Pipestone Rd, including adding a personnel exit door and removing an existing gypsum-board partition. The permit was filed May 22, 2025, under permit number COM-ALT-ADD-25-000042.
Summarized from City of Dallas records · updated May 22, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 22, 2025
- since May 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsClean & showcorrecting previous work without a permit add new personnel exit door infill opening in existing demising wall provide new 3'0"x7'0" hm door to existing demolition existing gyp bd partition
Clean & showcorrecting previous work without a permit add new personnel exit door infill opening in existing demising wall provide new 3'0"x7'0" hm door to existing demolition existing gyp bd partition
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3700 Pipestone Rd
What is being built at 3700 Pipestone Rd in Dallas?
A commercial alteration permit indicates a new personnel exit door and removal of an existing gypsum-board partition. It also describes infilling an opening in an existing demising wall.
When was work at 3700 Pipestone Rd permitted?
The City of Dallas permit was filed on May 22, 2025.
What is permit COM-ALT-ADD-25-000042 for?
The permit describes adding a personnel exit door, infilling an opening in an existing demising wall, and removing an existing gypsum-board partition.
Is a new building being constructed at 3700 Pipestone Rd?
The permit describes alterations to an existing space, including door and partition work; it does not describe construction of a new building.
What work is happening near Rudoph Foods on Pipestone?
At 3700 Pipestone Rd, about 174 meters from Rudoph Foods Phase 1-3 at 3660 Pipestone, a City permit describes interior partition work and a new personnel exit door. The permit was filed May 22, 2025.
Also being built nearby
All of 75212- 3660 Pipestone Road · St Germain Holdings LtdApr 22, 2025Rudolph foods - oms expansion — renovation/alteration — new hvac, walkable imp ceiling, paint finishes, new rollup doors, new lighting (area of work approx 16000 sq ft) · 174 m away
- 3660 Pipestone · St. Germain Holdings LtdMar 17, 2026Rudoph foods phase 1-3 — renovation/alteration — interior insulated metal panel walls, replace (3) high speed doors, insulated metal panel ceiling, metal panel wall skins · 174 m away
- 3660 Pipestone RdJan 14, 2026Install hvac upgrades for production and packaging area · 174 m away
- 3702 La Reunion PkwyJun 22, 2026Installing 307 lf of 6ft chain link fencing with a 30' roll/slide gate, 2 - 4ft pedestrian gates · 260 m away
- 3801-3845 La Reunion Parkway · Pinnacle 3May 12, 2025400-source logistics — renovation/alteration — tenant improvements within existing shell building · 313 m away
- 3845 La Reunion PkwyDec 10, 2025No, work is being done we are trying to get electricity restored · 313 m away
- 3636 La Reunion PkwyMar 25, 2026Replace 1.5" double check valve on irrigation system · 319 m away
- 3615 Pipestone RdMar 11, 2026102,240 sq ft - prepare roof for recover application. mechanically fasten 1.5" iso to existing roof. mechanically fasten 60 mil tpo membrane.*no structrual changes*building is occupied · 352 m away
- 2104 French Settlement RdNov 3, 2026Bu zo the scope of work consists of installing a new pallet racking system inside an existing warehouse facility. the project includes the installation of 72 bays measuring 108" x 28" and 8 bays measuring 156" x 28", for a total of 936 pallet positions. the racking footprint covers approximately 1,755 square feet of floor area. work includes anchoring uprights to the existing concrete slab, assembling beams, wire decking, and all structural components in accordance with the stamped engineering plans and calculations. no modifications will be made to the building’s structural, electrical, mechanical, or plumbing systems. all installation will be performed by an insured and qualified crew following osha safety standards and manufacturer specifications. the racking system will be used for high?pile storage as defined by the fire code · 368 m away
- 3875 La Reunion PkwySep 4, 2025Gas test · 412 m away
- 2140 French Settlement RdNov 25, 2025Inspection of gas lines for gas service re-instatement · 417 m away
- 3901 Pipestone RdMay 13, 2025Install gas line · 432 m away
More demolitions in 75212.