3924 Dismount St
Dallas, TX 75211
Gas test permit filed at 3924 Dismount St
A residential plumbing permit for a gas test at 3924 Dismount St was filed with the City of Dallas on May 10, 2026. The record does not specify new construction or provide a project value.
Summarized from City of Dallas records · updated May 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 10, 2026
- since May 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3924 Dismount St
What is being built at 3924 Dismount St?
The City of Dallas permit describes a gas test under residential plumbing permit RES-PLM-26-004855, filed May 10, 2026. It does not describe a new building.
What work is planned at 3924 Dismount St in Dallas?
The permit record lists a gas test. It does not provide further details about the work.
When was the gas test permit filed at 3924 Dismount St?
The City of Dallas filed residential plumbing permit RES-PLM-26-004855 on May 10, 2026.
Is a new home being built at 3924 Dismount St?
The available permit describes a gas test, not new home construction.
How much will the work at 3924 Dismount St cost?
The permit record does not provide a project cost or reported valuation.
Also being built nearby
All of 75211- 3914 Dismount StAug 11, 2025Gas system replacement · 6 m away
- 3931 Dismount StJul 29, 2025New 200 amp panel and meter · 14 m away
- 3834 Dismount StAug 9, 2026Electric service upgrade · 127 m away
- 3827 Dismount StNov 5, 2026A.o. smith signature 100 40-gallons tall 6-year warranty 35500-btu natural gas water heater replacement like-for-like · 142 m away
- 211 N Albrook StJul 8, 2025Gas test with release · 149 m away
- 3850 Mt Ranier StSep 11, 2026Relocate gas meter · 151 m away
- 3848 Mt Ranier StSep 11, 2026Relocate gas meter · 154 m away
- 3844 Mt Ranier StNov 10, 2026Relocate gas meter · 158 m away
- 3809 Dismount StAug 10, 2026Gas test, repair replacement · 168 m away
- 312 N Gilpin AveAug 15, 2025Sewer line replacements at 2” branch and 4” main location: building 1 / units 103 thru 106__________________• shut off the building’s water supply to prevent accidental flushing of debris or waste during the course of the work.• remove and repair up to 50 linear feet between units 103 through 106, main sewer line is 4-inch and 2-inch branch lines. • repair with new pvc pipes, pvc fittings and ct adapters were needed.• level on new pipe with strap or hangers for proper flow.• check for proper flow and leaks.*note:- this does not include any sewage water removal repairs - j national is not responsible for any tension cables or utilities · 272 m away
- 3815 Mt Everest StOct 22, 2025Remove old roof shingles and reroof house with new roof shingles · 291 m away
- 3811 Mt Everest StDec 18, 2025Mcr pv instalattion of:50x430 jinko solar jkm430n-54hl4r-b modulesroof mounted solar photovoltaic modulessystem size: 21.500 kw dc stcsystem size: 16.000 kw ac · 298 m away