Recent · latest filing Jun 2026Residential
4562 Black Rock Dr
Dallas, TX 75211
Shingle roof replacement permitted at 4562 Black Rock Dr
A full shingle roof replacement was permitted for the residence at 4562 Black Rock Dr in Dallas on June 11, 2026. The City of Dallas record lists permit RES-ROOF-26-000962.
Summarized from City of Dallas records · updated Jun 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2026
- since Jun 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4562 Black Rock Dr
What work is planned at 4562 Black Rock Dr?
A City of Dallas permit lists a full shingle roof replacement at the residence.
When was the roof replacement permitted?
The permit was filed on June 11, 2026.
What is the permit number for 4562 Black Rock Dr?
The permit number is RES-ROOF-26-000962.
Is a new building being built at 4562 Black Rock Dr?
The record describes a full shingle roof replacement, not new construction.
Who issued the permit for the work at 4562 Black Rock Dr?
The permit record is from the City of Dallas.
Also being built nearby
All of 75211- 4606 Black Rock DrJun 26, 2026Re-roof; no re-deck · 44 m away
- 4629 Bridgewater LnJul 1, 2025Water heater 50 gal replacement · 107 m away
- 4611 Bridgewater LnDec 3, 2025Gas test for release · 110 m away
- 4589 Bonanza LnJun 18, 2025Remove old hvac and replace with new 3ton complete gas heat upflow system. indoor unit, outdoor unit, thermostat, and coil · 182 m away
- 4669 Ridge Point DrAug 12, 2026Replace meter base · 208 m away
- 4628 Bonanza LnMar 6, 2026Electrical repairs for 200amps service · 215 m away
- 4547 Bonanza LnNov 12, 2026Install 40 gallon gas water heater in hallway closet (swap out) · 225 m away
- 1808 Western Park DrOct 20, 2020Gas test & code upgrade on with h · 255 m away
- 4502 Ridge Point DrJul 21, 2026Install temporary electrical service to supply power to a temporary construction field office trailer for the chalk hill trail phase 1 project. work includes installation of a temporary service pole, meter socket, service disconnect, distribution equipment, grounding and bonding, feeders, branch circuits, and all associated wiring necessary to provide electrical service to the temporary construction trailer. the installation is intended solely to support project management, administrative operations, safety meetings, inspections, and construction activities for the duration of the project. all work will be performed in accordance with the currently adopted national electrical code (nec), city of dallas requirements, and applicable utility provider standards. upon completion of the project, the temporary electrical service and associated equipment will be removed · 279 m away
- 1720 Western Park DrNov 25, 2025Gas test · 289 m away
- 4651 Old Spanish TrlAug 10, 2026Derate · 297 m away
- 4621 Cedar Path DrFeb 16, 2026Install 40 gallon gas water heater · 308 m away