4611 Bridgewater Ln
Dallas, TX 75211
Gas test permit filed at 4611 Bridgewater Ln
A City of Dallas residential plumbing permit filed on December 3, 2025, records a gas test for release at 4611 Bridgewater Ln. The record does not describe new construction or provide a project valuation.
Summarized from City of Dallas records · updated Dec 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 3, 2025
- since Dec 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4611 Bridgewater Ln
What is being built at 4611 Bridgewater Ln?
The City of Dallas record does not list a new building project. It records a gas test for release under residential plumbing permit RES-PLM-25-008262.
What work does the permit at 4611 Bridgewater Ln cover?
The permit description is “Gas test for release.” It was filed on December 3, 2025.
When was the gas test permit filed for 4611 Bridgewater Ln?
The City of Dallas filing is dated December 3, 2025. The permit number is RES-PLM-25-008262.
Is a new home being built at 4611 Bridgewater Ln?
The available record does not indicate that a new home is being built. It lists a residential plumbing permit for a gas test for release.
What is the permit number for 4611 Bridgewater Ln?
The City of Dallas residential plumbing permit number is RES-PLM-25-008262. Its description is “Gas test for release.”
Also being built nearby
All of 75211- 4629 Bridgewater LnJul 1, 2025Water heater 50 gal replacement · 23 m away
- 4669 Ridge Point DrAug 12, 2026Replace meter base · 98 m away
- 4562 Black Rock DrJun 11, 2026Full shingle roof replacement · 110 m away
- 4606 Black Rock DrJun 26, 2026Re-roof; no re-deck · 127 m away
- 1808 Western Park DrOct 20, 2020Gas test & code upgrade on with h · 186 m away
- 4651 Old Spanish TrlAug 10, 2026Derate · 187 m away
- 4502 Ridge Point DrJul 21, 2026Install temporary electrical service to supply power to a temporary construction field office trailer for the chalk hill trail phase 1 project. work includes installation of a temporary service pole, meter socket, service disconnect, distribution equipment, grounding and bonding, feeders, branch circuits, and all associated wiring necessary to provide electrical service to the temporary construction trailer. the installation is intended solely to support project management, administrative operations, safety meetings, inspections, and construction activities for the duration of the project. all work will be performed in accordance with the currently adopted national electrical code (nec), city of dallas requirements, and applicable utility provider standards. upon completion of the project, the temporary electrical service and associated equipment will be removed · 197 m away
- 1720 Western Park DrNov 25, 2025Gas test · 203 m away
- 4644 Cedar Tone DrJul 16, 2026Replace roof shingles · 250 m away
- 4589 Bonanza LnJun 18, 2025Remove old hvac and replace with new 3ton complete gas heat upflow system. indoor unit, outdoor unit, thermostat, and coil · 288 m away
- 4547 Bonanza LnNov 12, 2026Install 40 gallon gas water heater in hallway closet (swap out) · 309 m away
- 1623 Western Park CtNov 13, 2025Gas provider requesting city approval. no repair, test only · 313 m away