4034 Furey St
Dallas, TX 75212
New single-family home permitted at 4034 Furey St
A new single-family home is planned at 4034 Furey St, according to a City of Dallas residential new-construction permit filed July 31, 2025. Plumbing and electrical permits followed on August 5, and a mechanical permit was filed September 26, 2025.
Summarized from City of Dallas records · updated Sep 26, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Sep 26, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 4034 Furey St
What is being built at 4034 Furey St?
City of Dallas records indicate a new single-family home. The residential new-construction permit is RES-NEW-25-000015, filed July 31, 2025.
When was the new home at 4034 Furey St permitted?
The new-construction permit was filed July 31, 2025. Plumbing and electrical permits were filed August 5, followed by a mechanical permit on September 26, 2025.
What construction permits were filed for 4034 Furey St?
Dallas records list a new-construction permit, a plumbing permit, an electrical permit and a mechanical permit. The permits were filed between July 31 and September 26, 2025.
Is 4034 Furey St a single-family home or an apartment building?
The July 31, 2025, permit describes the project as “New sfd,” indicating a new single-family dwelling.
Were plumbing, electrical and mechanical permits filed for 4034 Furey St?
Yes. Plumbing and electrical permits were filed August 5, 2025, and the mechanical permit was filed September 26, 2025.
Also being built nearby
All of 75212- 4015 Furey StSep 5, 2025New construction residential · 31 m away
- 4003 Furey StJul 24, 2025Gas meter relocate on behalf of atmos · 47 m away
- 4014 Soloman DrJun 13, 2025Nsfaa-it is for a 835.1 sq ft storage that is next to the home but is not attached. it has no electrical work or utilities · 103 m away
- 4010 Soloman DrJan 16, 2026Provide and install a complete mechanical system for a new construction home in accordance with approved plans, local building codes, and manufacturer specifications. scope includes layout, rough-in, and final installation of hvac equipment, ductwork, ventilation, and related components. install heating and cooling units, supply and return air ducts, registers, grilles, thermostats, condensate drainage, and exhaust systems as required. perform system start-up, testing, and balancing to ensure proper airflow, efficiency, and occupant comfort. coordinate required inspections and provide final commissioning upon completion · 104 m away
- 4002 Soloman DrFeb 4, 2026Provide and install a complete mechanical system for anew construction home in accordance with approvedplans, local building codes, and manufacturerspecifications. scope includes layout, rough-in, and finalinstallation of hvac equipment, ductwork, ventilation,and related components. install heating and coolingunits, supply and return air ducts, registers, grilles,thermostats, condensate drainage, and exhaust systemsas required. perform system start-up, testing, andbalancing to ensure proper airflow, efficiency, andoccupant comfort. coordinate required inspections andprovide final commissioning upon completion · 108 m away
- 4107 Vineyard DrJul 10, 2025New build · 134 m away
- 4115 Vineyard DrJun 6, 2025Driveway approach constructionscope of work:this project involves the construction of a new concrete driveway approach designed to provide durable, code-compliant vehicular access from the public roadway to private property. the work includes demolition (if applicable), site preparation, formwork, concrete placement, and finishing, in accordance with municipal standards and engineering specifications.specifications: • dimensions: [e.g., 18 feet wide by 10 feet long, with a 6-inch thickness] • concrete mix: 3,000–4,000 psi compressive strength, air-entrained for freeze-thaw durability • subbase preparation: compacted granular base (minimum 4” thickness), graded for proper drainage • reinforcement: rebar grid as required by code or design • formwork: wood or steel forms staked and braced to maintain alignment and elevation • placement & finishing: concrete poured and leveled to match existing sidewalk or curb grade, broom finish for slip resistance, with appropriate control joints to prevent cracking • curing: moist cure or application of curing compound to ensure proper hydration and strength development • compliance: meets all applicable local municipal and dot standards, including ada compliance at pedestrian crossings where applicableadditional notes: • traffic control measures were implemented during construction to ensure public safety. • inspection and approval obtained from city of dallas. • final product provides a smooth, durable transition from street to property with adequate load-bearing capacity for residential or light commercial use · 143 m away
- 4123 Vineyard DrMar 31, 2026Gas test + repair - gas meter locked · 152 m away
- 3925 Furey StJul 7, 2025Gas test · 157 m away
- 4122 Soloman DrSep 22, 2025Hvac · 161 m away
- 3919 Furey StJul 22, 2025Gas test · 164 m away
- 4134 Soloman DrJul 14, 2026Install 36 steel piers under home to stabilize foundation · 174 m away