Foundation repair planned at 4134 Soloman Dr
A City of Dallas permit indicates foundation stabilization work at 4134 Soloman Dr, including installation of 36 steel piers beneath the home. The permit was filed July 14, 2026.
Summarized from City of Dallas records · updated Jul 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 14, 2026
- since Jul 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4134 Soloman Dr
What is being built at 4134 Soloman Dr?
The City of Dallas permit describes foundation repair, not a new building. The work is to install 36 steel piers beneath the home to stabilize its foundation.
What work is planned at 4134 Soloman Dr in Dallas?
The permit calls for installing 36 steel piers under the home for foundation stabilization. It was filed July 14, 2026.
When was the foundation repair permit filed for 4134 Soloman Dr?
The City of Dallas permit was filed July 14, 2026.
What is the permit number for work at 4134 Soloman Dr?
The permit number is RES-FDN-26-000569. It covers residential foundation repair.
How many steel piers are planned at 4134 Soloman Dr?
The permit describes installing 36 steel piers beneath the home to stabilize its foundation.
Also being built nearby
All of 75212- 4122 Soloman DrSep 22, 2025Hvac · 17 m away
- 4020 Shadrack DrAug 27, 20253 ton condenser changeout in back yard, 3 ton indoor coil, and 66k btus furnace changeout in attic · 92 m away
- 3535 Canada DrSep 7, 2026Replacing the electric water heater · 104 m away
- 4014 Soloman DrJun 13, 2025Nsfaa-it is for a 835.1 sq ft storage that is next to the home but is not attached. it has no electrical work or utilities · 168 m away
- 4010 Soloman DrJan 16, 2026Provide and install a complete mechanical system for a new construction home in accordance with approved plans, local building codes, and manufacturer specifications. scope includes layout, rough-in, and final installation of hvac equipment, ductwork, ventilation, and related components. install heating and cooling units, supply and return air ducts, registers, grilles, thermostats, condensate drainage, and exhaust systems as required. perform system start-up, testing, and balancing to ensure proper airflow, efficiency, and occupant comfort. coordinate required inspections and provide final commissioning upon completion · 173 m away
- 4034 Furey StSep 26, 2025Install mechanical for new construction · 174 m away
- 4002 Soloman DrFeb 4, 2026Provide and install a complete mechanical system for anew construction home in accordance with approvedplans, local building codes, and manufacturerspecifications. scope includes layout, rough-in, and finalinstallation of hvac equipment, ductwork, ventilation,and related components. install heating and coolingunits, supply and return air ducts, registers, grilles,thermostats, condensate drainage, and exhaust systemsas required. perform system start-up, testing, andbalancing to ensure proper airflow, efficiency, andoccupant comfort. coordinate required inspections andprovide final commissioning upon completion · 184 m away
- 4015 Furey StSep 5, 2025New construction residential · 192 m away
- 4123 Vineyard DrMar 31, 2026Gas test + repair - gas meter locked · 192 m away
- 4115 Vineyard DrJun 6, 2025Driveway approach constructionscope of work:this project involves the construction of a new concrete driveway approach designed to provide durable, code-compliant vehicular access from the public roadway to private property. the work includes demolition (if applicable), site preparation, formwork, concrete placement, and finishing, in accordance with municipal standards and engineering specifications.specifications: • dimensions: [e.g., 18 feet wide by 10 feet long, with a 6-inch thickness] • concrete mix: 3,000–4,000 psi compressive strength, air-entrained for freeze-thaw durability • subbase preparation: compacted granular base (minimum 4” thickness), graded for proper drainage • reinforcement: rebar grid as required by code or design • formwork: wood or steel forms staked and braced to maintain alignment and elevation • placement & finishing: concrete poured and leveled to match existing sidewalk or curb grade, broom finish for slip resistance, with appropriate control joints to prevent cracking • curing: moist cure or application of curing compound to ensure proper hydration and strength development • compliance: meets all applicable local municipal and dot standards, including ada compliance at pedestrian crossings where applicableadditional notes: • traffic control measures were implemented during construction to ensure public safety. • inspection and approval obtained from city of dallas. • final product provides a smooth, durable transition from street to property with adequate load-bearing capacity for residential or light commercial use · 194 m away
- 4107 Vineyard DrJul 10, 2025New build · 196 m away
- 3419 Canada DrNov 11, 2026Nsfaa-new single-family construction.2 stories, 4 bedrooms, 4 bathroom & 2 car garage · 201 m away