Gas test and repair permit filed at 4123 Vineyard Dr
A City of Dallas residential plumbing permit records a gas test and repair at 4123 Vineyard Dr after the gas meter was locked. The permit was filed March 31, 2026, under permit number RES-PLM-26-003408.
Summarized from City of Dallas records · updated Mar 31, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 31, 2026
- since Mar 31, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4123 Vineyard Dr
What work is permitted at 4123 Vineyard Dr?
A City of Dallas residential plumbing permit describes a gas test and repair because the gas meter was locked.
When was the permit filed for 4123 Vineyard Dr?
The permit was filed March 31, 2026.
What is the permit number for 4123 Vineyard Dr?
The permit number is RES-PLM-26-003408.
Is a new home being built at 4123 Vineyard Dr?
The available City of Dallas record is for a gas test and repair, not a new-home construction permit.
What work is happening near Walia & Sons Real Estate on N Westmoreland Road?
A residential plumbing permit at 4123 Vineyard Dr, about 230 meters from Walia & Sons Real Estate, records a gas test and repair.
Also being built nearby
All of 75212- 4115 Vineyard DrJun 6, 2025Driveway approach constructionscope of work:this project involves the construction of a new concrete driveway approach designed to provide durable, code-compliant vehicular access from the public roadway to private property. the work includes demolition (if applicable), site preparation, formwork, concrete placement, and finishing, in accordance with municipal standards and engineering specifications.specifications: • dimensions: [e.g., 18 feet wide by 10 feet long, with a 6-inch thickness] • concrete mix: 3,000–4,000 psi compressive strength, air-entrained for freeze-thaw durability • subbase preparation: compacted granular base (minimum 4” thickness), graded for proper drainage • reinforcement: rebar grid as required by code or design • formwork: wood or steel forms staked and braced to maintain alignment and elevation • placement & finishing: concrete poured and leveled to match existing sidewalk or curb grade, broom finish for slip resistance, with appropriate control joints to prevent cracking • curing: moist cure or application of curing compound to ensure proper hydration and strength development • compliance: meets all applicable local municipal and dot standards, including ada compliance at pedestrian crossings where applicableadditional notes: • traffic control measures were implemented during construction to ensure public safety. • inspection and approval obtained from city of dallas. • final product provides a smooth, durable transition from street to property with adequate load-bearing capacity for residential or light commercial use · 11 m away
- 4107 Vineyard DrJul 10, 2025New build · 22 m away
- 3419 Canada DrNov 11, 2026Nsfaa-new single-family construction.2 stories, 4 bedrooms, 4 bathroom & 2 car garage · 121 m away
- 3343 Canada DrOct 22, 2025Two air handlers and two heat pump systems will be installed along with duct work etc... rough in and final mechanical inspection completions · 148 m away
- 4034 Furey StSep 26, 2025Install mechanical for new construction · 152 m away
- 3331 Canada DrSep 16, 2026New electrical work · 158 m away
- 4015 Furey StSep 5, 2025New construction residential · 182 m away
- 4122 Soloman DrSep 22, 2025Hvac · 191 m away
- 4134 Soloman DrJul 14, 2026Install 36 steel piers under home to stabilize foundation · 192 m away
- 4003 Furey StJul 24, 2025Gas meter relocate on behalf of atmos · 196 m away
- 4010 Aransas StDec 1, 2025Remove chainlink fenceinstall 5" octagon steel post for a 7' wooden fence · 197 m away
- 4121 N Westmoreland RdApr 10, 2026Meter repair · 217 m away