6227 Malcolm Dr
Dallas, TX 75214
6227 Malcolm Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 6227 Malcolm Dr, Dallas, TX 75214. The most recent, filed August 18, 2025, covers: “Installed new hvac”.
Compiled from City of Dallas records · updated Aug 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2025
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6227 Malcolm Dr
What is being built at 6227 Malcolm Dr?
The latest filing (City of Dallas permit RES-MEC-25-002011, August 18, 2025) covers installed new hvac.
How many permits and filings does 6227 Malcolm Dr have?
1 filing across 1 project, from August 18, 2025 to August 18, 2025.
Is there other construction near 6227 Malcolm Dr?
Yes. Nearby filings include 6221 Malcolm Dr (install 1 50-gal gas water heater in pull down attic, Feb 3, 2026); 6237 Malcolm Dr (nsfaa residential addition, Oct 29, 2026); 6236 Malcolm Dr (demolition of house, Feb 24, 2026).
How do I get alerts for new permits at 6227 Malcolm Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 6221 Malcolm DrFeb 3, 2026Install 1 50-gal gas water heater in pull down attic · 22 m away
- 6237 Malcolm DrOct 29, 2026Nsfaa residential addition · 37 m away
- 6236 Malcolm DrFeb 24, 2026Demolition of house · 39 m away
- 6226 Revere PlNov 13, 2026Install 8' fence · 78 m away
- 6223 Revere PlAug 27, 2026Replace the existing 100 amp federal pacific stab-lok load center with a new 200amp service.install a new 2 inch rigid galvanized steel service mast, weatherhead, and roofflashing. install a new 200 amp ringless meter socket on the exterior wall at theheight required by oncor. install new 2/0 awg copper service entrance conductors.install a new 200 amp, 42 space, nema 3r main breaker load center on the exteriorwall. the existing load center is in an interior pantry that cannot provide therequired working clearance in front of a panel, so the new load center is installedoutdoors. the outdoor main breaker serves as the emergency disconnect.remove the existing federal pacific load center. install junction enclosures at theformer panel location and re-route 26 existing branch circuits through the attic tothe new load center.install a whole house surge protective device.install a new grounding electrode system consisting of two 5/8 inch by 8 foot groundrods, a cold water pipe bond, an intersystem bonding termination, and a #4 awg barecopper grounding electrode conductor. install insulated grounding bushings andsupply side bonding jumpers on the service raceway · 92 m away
- 6212 Revere PlJan 27, 2021Gas relay or repair with test · 94 m away
- 6240 Revere PlNov 9, 2026Installing new yard gas service and running pipe in attic for water heater and furnace · 95 m away
- 6231 Mccommas BlvdAug 1, 2025Sidewalk removal and replace of 4x27. a new driveway was done recently and the owner wanted to go ahead and get all the row new · 102 m away
- 6215 Mccommas BlvdDec 15, 2025Sewer repairs in the crawl space and in the yard · 108 m away
- 6209 Mccommas BlvdMay 21, 2025Foundation repair-shim 957sqft · 118 m away
- 6239 Mccommas BlvdNov 4, 2025Gas repair with pressure test · 117 m away
- 6242 Mccommas BlvdOct 28, 202641ft board on board cedar fence no taller than 9ft · 125 m away