6444 E Mockingbird Ln
Dallas, TX 75214
6444 E Mockingbird Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 6444 E Mockingbird Ln, Dallas, TX 75214. The most recent, filed June 11, 2025, covers: “Replaced 2 rtu systems with 2 new rtu systems”.
Compiled from City of Dallas records · updated Jun 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2025
- since Jun 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6444 E Mockingbird Ln
What is being built at 6444 E Mockingbird Ln?
The latest filing (City of Dallas permit RES-MEC-25-000592, June 11, 2025) covers replaced 2 rtu systems with 2 new rtu systems.
How many permits and filings does 6444 E Mockingbird Ln have?
1 filing across 1 project, from June 11, 2025 to June 11, 2025.
What is being built near Trea Hillside Village Owner in Dallas?
6444 E Mockingbird Ln is about 97 m from Trea Hillside Village Owner (6465 East Mockingbird Lane). Its latest filing is for replaced 2 rtu systems with 2 new rtu systems.
Is there other construction near 6444 E Mockingbird Ln?
Yes. Nearby filings include 6434 E Mockingbird Ln (replacement of the failed 3/4-inch reduced pressure zone assembly, Jul 22, 2025); 6464 E Mockingbird Ln (roof recovery wind vented system- job site safety and setup.- remove the loose spray foam coating system to ensure a dry roofing surface forthe new roofing system installation.- install 1/2" securock over roofing surface: loose laid.- install 60mil tpo membrane over entire field, loose laid; color: white- terminated the outside perimeter edge and penetrations with termination barand sealed with air-seal rope.- install 60mil tpo membrane on parapet walls, adhered up and over walls withbonding adhesive; color to match field membrane. terminate parapet wallmembrane with termination bar.- all tpo seams and penetration accessories to be heat welded with hot air andtested.- install equalization vent per manufacturer's specifications.- staging area to be determined by owner- all dumpsters and lift provided by farha roofing kc, llc- clean and haul off all roofing related debris on a daily basis.- wind vent roofing system will be covered by a 20 year ndl (no dollar limit) fullsystem warranty and a 2 year farha roofing kc, llc workmanship warranty.-metal- install new sheet metal edge detail around the outside perimeter of thebuilding, Oct 24, 2025); 6465 East Mockingbird Lane (wonder restaurant tenant finish out — renovation/alteration — creating a wonder restaurant inside an existing space, Nov 6, 2026).
How do I get alerts for new permits at 6444 E Mockingbird Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 6434 E Mockingbird LnJul 22, 2025Replacement of the failed 3/4-inch reduced pressure zone assembly · 36 m away
- 6464 E Mockingbird LnOct 24, 2025Roof recovery wind vented system- job site safety and setup.- remove the loose spray foam coating system to ensure a dry roofing surface forthe new roofing system installation.- install 1/2" securock over roofing surface: loose laid.- install 60mil tpo membrane over entire field, loose laid; color: white- terminated the outside perimeter edge and penetrations with termination barand sealed with air-seal rope.- install 60mil tpo membrane on parapet walls, adhered up and over walls withbonding adhesive; color to match field membrane. terminate parapet wallmembrane with termination bar.- all tpo seams and penetration accessories to be heat welded with hot air andtested.- install equalization vent per manufacturer's specifications.- staging area to be determined by owner- all dumpsters and lift provided by farha roofing kc, llc- clean and haul off all roofing related debris on a daily basis.- wind vent roofing system will be covered by a 20 year ndl (no dollar limit) fullsystem warranty and a 2 year farha roofing kc, llc workmanship warranty.-metal- install new sheet metal edge detail around the outside perimeter of thebuilding · 73 m away
- 6465 East Mockingbird Lane · Trea Hillside Village Owner LLCNov 6, 2026Wonder restaurant tenant finish out — renovation/alteration — creating a wonder restaurant inside an existing space · 97 m away
- 6465 E Mockingbird · Trea Hillside Village Owner LLCSep 18, 2024J. hilburn build out — renovation/alteration — taking suite 369 from a shell to a finished retail space per the plans · 97 m away
- 6465 E. Mockingbird Lane · Trea Hillside Village Owner, LLCAug 27, 2026Chase hillside dallas - relo — new construction — new construction of a 1-story retail banking center with (1) drive-up atm and (1) drive-up night drop (ahd) - (4,077 sq ft) · 97 m away
- 6465 E Mockingbird Ln · Trea Hillside Village Owner, LLCSep 29, 2026Add ductwork to existing system · 97 m away
- 4316 Abrams RdMay 7, 2026Upgrading 10 sub-panels · 163 m away
- 6431 Anita StJun 17, 2026Gas repipe from meter to inside home · 188 m away
- 6423 Anita StApr 14, 2026Replacing the gas water heater · 189 m away
- 6419 Anita StSep 14, 2026Nsfaa-add cedar deck on front right side of home. install new standing seam roof · 190 m away
- 6447 Anita StSep 8, 2026New construction plumbing · 193 m away
- 4040 Abrams RdJul 10, 2025Installation of new 1/2" backflow device at the water/tea station · 195 m away