6465 E. Mockingbird Lane
Dallas, TX 75214 · Chase Hillside Dallas - Relo, Jungle Fitness Studio - Lakewood + 3 more
Chase banking center and fitness studio work at 6465 E Mockingbird
A new Chase retail banking center and a tenant finish-out for Jungle Fitness Studio are listed at this multi-tenant property. TDLR registered the Chase new-construction project on August 27, 2026, and marked the fitness-studio alteration review complete on March 26, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 27, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Aug 27, 2026
- since Dec 2, 2024
- Largest scope
- 10,001 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
In state plan reviewChase Hillside Dallas - Relo
4,077 sq ft · $2.5M est.
- RegisteredAug 27, 2026
- Plan reviewnow
- ConstructionAug '27 – Apr '28
- Inspected
- Closed
Construction is scheduled to start Aug 23, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 4 phone numbers
Permit & project history
5 projectsNew construction of a 1-story retail banking center with (1) drive-up atm and (1) drive-up night drop (ahd) - (4,077 sq ft) — chase hillside dallas - relo
TDLR project registrationNew ConstructionProject Registered4,077 sq ft$2.5M est.- Project #
- TABS2026028996
- Tenant / owner
- Chase Hillside Dallas - Relo
- Design firm
- Pro
- Contact
- Pro
Tenant finish out of an existing 5,315 sq ft fitness studio space. there will be no change to the use — hillside village
TDLR project registrationRenovation/AlterationReview Complete5,315 sq ft$850K est.- Project #
- TABS2026015968
- Tenant / owner
- Jungle Fitness Studio - Lakewood
- Design firm
- Pro
- Contact
- Pro
Second generation space, finish-out for a liquor store — multi-tenant shell building
TDLR project registrationRenovation/AlterationProject Registered10,001 sq ft$200K est.- Project #
- TABS2025024735
- Tenant / owner
- Liquorland Tenant Finish Out
- Design firm
- Pro
- Contact
- Pro
Alterations to an existing retail suite. the final configuration will include a general retail sales area, fitting room(s), toilet facilities and related elements, and lease space support areas. — hillside village shopping center
TDLR project registrationRenovation/AlterationProject Registered1,932 sq ft$50K est.- Project #
- TABS2025014916
- Tenant / owner
- Alterations - Miller Westby
- Design firm
- Pro
- Contact
- Pro
Basic remodel — hillside village
TDLR project registrationRenovation/AlterationProject Closed1,800 sq ft$80K est.- Project #
- TABS2025006598
- Tenant / owner
- Face Foundrie Hillside
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6465 E. Mockingbird Lane
What is being built at 6465 E Mockingbird Lane?
TDLR records list a new 4,077-square-foot Chase retail banking center with a drive-up ATM and night drop. A separate record covers a tenant finish-out for Jungle Fitness Studio in an existing 5,315-square-foot fitness studio space.
Is Chase opening a new bank on E Mockingbird Lane?
A TDLR registration dated August 27, 2026, lists new construction for the Chase Hillside Dallas - Relo retail banking center at 6465 E Mockingbird Lane. The registration describes a drive-up ATM and a drive-up night drop.
Is a new gym going in at 6465 E Mockingbird Lane?
TDLR records list a tenant finish-out for Jungle Fitness Studio - Lakewood in an existing 5,315-square-foot fitness studio space. The project description says there will be no change to the use; its review was marked complete on March 26, 2026.
What's happening near Wonder Restaurant at 6465 E Mockingbird Lane?
Records at this address list a new Chase retail banking center and a Jungle Fitness Studio tenant finish-out. A separate nearby activity record describes a Wonder restaurant tenant finish-out filed November 6, 2026.
What's happening near Avara on E Mockingbird Lane?
The project records place the Chase banking center and Jungle Fitness Studio work at 6465 E Mockingbird Lane, the same address listed for Avara. The property is identified as multi-tenant.
When were the projects at 6465 E Mockingbird Lane filed?
The Jungle Fitness Studio tenant finish-out was filed March 26, 2026, under TDLR project TABS2026015968. The Chase banking center registration was filed August 27, 2026, under TABS2026028996.
Also being built nearby
All of 75214- 6465 E Mockingbird · Trea Hillside Village Owner LLCSep 18, 2024J. hilburn build out — renovation/alteration — taking suite 369 from a shell to a finished retail space per the plans
- 6465 East Mockingbird Lane · Trea Hillside Village Owner LLCNov 6, 2026Wonder restaurant tenant finish out — renovation/alteration — creating a wonder restaurant inside an existing space
- 6465 E Mockingbird Ln · Trea Hillside Village Owner, LLCSep 29, 2026Add ductwork to existing system
- 6464 E Mockingbird LnOct 24, 2025Roof recovery wind vented system- job site safety and setup.- remove the loose spray foam coating system to ensure a dry roofing surface forthe new roofing system installation.- install 1/2" securock over roofing surface: loose laid.- install 60mil tpo membrane over entire field, loose laid; color: white- terminated the outside perimeter edge and penetrations with termination barand sealed with air-seal rope.- install 60mil tpo membrane on parapet walls, adhered up and over walls withbonding adhesive; color to match field membrane. terminate parapet wallmembrane with termination bar.- all tpo seams and penetration accessories to be heat welded with hot air andtested.- install equalization vent per manufacturer's specifications.- staging area to be determined by owner- all dumpsters and lift provided by farha roofing kc, llc- clean and haul off all roofing related debris on a daily basis.- wind vent roofing system will be covered by a 20 year ndl (no dollar limit) fullsystem warranty and a 2 year farha roofing kc, llc workmanship warranty.-metal- install new sheet metal edge detail around the outside perimeter of thebuilding · 34 m away
- 6444 E Mockingbird LnJun 11, 2025Replaced 2 rtu systems with 2 new rtu systems · 97 m away
- 6503 E Mockingbird LnSep 17, 2026Gas test because service was off too long · 116 m away
- 6434 E Mockingbird LnJul 22, 2025Replacement of the failed 3/4-inch reduced pressure zone assembly · 132 m away
- 6502 Winton StJul 13, 2026We will do all the electrical run wire and install lights, switches and plug · 187 m away
- 4316 Abrams RdMay 7, 2026Upgrading 10 sub-panels · 212 m away
- 6529 St Moritz AveApr 7, 2026New sewer line from house to alley · 213 m away
- 6455 Ravendale LnAug 3, 2026Install new 40 gallon gas water heater · 213 m away
- 6514 Winton StNov 8, 2026New construction plumbing · 218 m away