6464 E Mockingbird Ln
Dallas, TX 75214
Roof recovery permitted at 6464 E Mockingbird Ln
A roof recovery project at 6464 E Mockingbird Ln was permitted on October 24, 2025. The work includes removing the existing loose spray foam coating and installing a 60-mil TPO membrane roofing system. The permit also covers new sheet metal edge details around the building perimeter.
Summarized from City of Dallas records · updated Oct 24, 2025
- Projects
- 10
- 10 filings
- Latest filing
- Oct 24, 2025
- since Oct 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
10 projectsRoof recovery wind vented system- job site safety and setup.- remove the loose spray foam coating system to ensure a dry roofing surface forthe new roofing system installation.- install 1/2" securock over roofing surface: loose laid.- install 60mil tpo membrane over entire field, loose laid; color: white- terminated the outside perimeter edge and penetrations with termination barand sealed with air-seal rope.- install 60mil tpo membrane on parapet walls, adhered up and over walls withbonding adhesive; color to match field membrane. terminate parapet wallmembrane with termination bar.- all tpo seams and penetration accessories to be heat welded with hot air andtested.- install equalization vent per manufacturer's specifications.- staging area to be determined by owner- all dumpsters and lift provided by farha roofing kc, llc- clean and haul off all roofing related debris on a daily basis.- wind vent roofing system will be covered by a 20 year ndl (no dollar limit) fullsystem warranty and a 2 year farha roofing kc, llc workmanship warranty.-metal- install new sheet metal edge detail around the outside perimeter of thebuilding
Roof recovery wind vented system- job site safety and setup.- remove the loose spray foam coating system to ensure a dry roofing surface forthe new roofing system installation.- install 1/2" securock over roofing surface: loose laid.- install 60mil tpo membrane over entire field, loose laid; color: white- terminated the outside perimeter edge and penetrations with termination barand sealed with air-seal rope.- install 60mil tpo membrane on parapet walls, adhered up and over walls withbonding adhesive; color to match field membrane. terminate parapet wallmembrane with termination bar.- all tpo seams and penetration accessories to be heat welded with hot air andtested.- install equalization vent per manufacturer's specifications.- staging area to be determined by owner- all dumpsters and lift provided by farha roofing kc, llc- clean and haul off all roofing related debris on a daily basis.- wind vent roofing system will be covered by a 20 year ndl (no dollar limit) fullsystem warranty and a 2 year farha roofing kc, llc workmanship warranty.-metal- install new sheet metal edge detail around the outside perimeter of thebuilding
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 6464 E Mockingbird Ln
What is being built at 6464 E Mockingbird Ln?
A roof recovery project is permitted at the address. The work includes a new TPO membrane roofing system, according to City of Dallas permit COM-ROOF-25-000154, filed October 24, 2025.
When was the roofing work at 6464 E Mockingbird Ln permitted?
The City of Dallas issued a commercial roofing permit filing dated October 24, 2025. The permit number is COM-ROOF-25-000154.
What kind of roof is being installed at 6464 E Mockingbird Ln?
The permit describes a 60-mil TPO membrane system, with a white membrane on the roof field. It also describes membrane installation on the parapet walls.
Is the building at 6464 E Mockingbird Ln being replaced?
The permit describes roof recovery work, not construction of a replacement building. It includes removing the loose spray foam coating and installing a new roofing system.
What work is happening near Wonder Restaurant Tenant Finish Out on Mockingbird Lane?
At 6464 E Mockingbird Ln, a commercial roofing permit filed October 24, 2025, covers roof recovery and installation of a TPO membrane system. Wonder Restaurant Tenant Finish Out is listed nearby at 6465 East Mockingbird Lane.
Also being built nearby
All of 75214- 6465 East Mockingbird Lane · Trea Hillside Village Owner LLCNov 6, 2026Wonder restaurant tenant finish out — renovation/alteration — creating a wonder restaurant inside an existing space · 34 m away
- 6465 E. Mockingbird Lane · Trea Hillside Village Owner, LLCAug 27, 2026Chase hillside dallas - relo — new construction — new construction of a 1-story retail banking center with (1) drive-up atm and (1) drive-up night drop (ahd) - (4,077 sq ft) · 34 m away
- 6465 E Mockingbird · Trea Hillside Village Owner LLCSep 18, 2024J. hilburn build out — renovation/alteration — taking suite 369 from a shell to a finished retail space per the plans · 34 m away
- 6465 E Mockingbird Ln · Trea Hillside Village Owner, LLCSep 29, 2026Add ductwork to existing system · 34 m away
- 6444 E Mockingbird LnJun 11, 2025Replaced 2 rtu systems with 2 new rtu systems · 73 m away
- 6434 E Mockingbird LnJul 22, 2025Replacement of the failed 3/4-inch reduced pressure zone assembly · 109 m away
- 6503 E Mockingbird LnSep 17, 2026Gas test because service was off too long · 142 m away
- 6502 Winton StJul 13, 2026We will do all the electrical run wire and install lights, switches and plug · 179 m away
- 6459 Anita StOct 8, 2026Installing 3.5 ton complete 95% gas system and 4 ton 95% gas system with duct work · 199 m away
- 6463 Anita StSep 1, 2026Install 8 pilings · 199 m away
- 6447 Anita StSep 8, 2026New construction plumbing · 200 m away
- 6431 Anita StJun 17, 2026Gas repipe from meter to inside home · 211 m away
More restaurants in 75214.