700 N Beacon St
Dallas, TX 75214
Permits cover a home remodel and foundation work
Dallas permits filed from March 26 through August 4, 2026, indicate foundation stabilization and interior and exterior work at this residence. The remodel includes kitchen and bathroom changes, a new bathroom adjoining a bedroom, and electrical and plumbing updates.
Summarized from City of Dallas records · updated Aug 4, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Aug 4, 2026
- since Mar 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsNsfaa interior/exterior remodel we will be gutting the existing kitchen and bathroom. everything in the kitchen will stay in the same location. in the bathroom we will be reducing the sinks from 2 to 1 and moving the location of the toilet. we will be converting the back right room to a bathroom adjoined to the bedroom. we will be replacing the water heater with a tankless unit. adding a 3/4" gas line for new tankless unit. we will be relocating and replacing the existing electrical panel to the back exterior wall. adding lighting and plugs in new bathroom. replacing the lighting in the kitchen and adding under cabinet lighting. adding lighting to the interior of some cabinets. adding a new electrical run for new microwave location.adding lighting in some rooms and replacing plugs and switches. relocating the 220 plug in the laundry room
Nsfaa interior/exterior remodel we will be gutting the existing kitchen and bathroom. everything in the kitchen will stay in the same location. in the bathroom we will be reducing the sinks from 2 to 1 and moving the location of the toilet. we will be converting the back right room to a bathroom adjoined to the bedroom. we will be replacing the water heater with a tankless unit. adding a 3/4" gas line for new tankless unit. we will be relocating and replacing the existing electrical panel to the back exterior wall. adding lighting and plugs in new bathroom. replacing the lighting in the kitchen and adding under cabinet lighting. adding lighting to the interior of some cabinets. adding a new electrical run for new microwave location.adding lighting in some rooms and replacing plugs and switches. relocating the 220 plug in the laundry room
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 700 N Beacon St
What is being built at 700 N Beacon St in Dallas?
The permits describe work on an existing residence, not a new building. The planned work includes a remodel, bathroom changes, and foundation stabilization.
When were permits filed for 700 N Beacon St?
The first listed permit was filed March 26, 2026, for foundation repair (RES-FDN-26-000261). The latest listed permit was filed August 4, 2026, for bathroom plumbing (RES-PLM-26-008073).
What does the remodel at 700 N Beacon St include?
The July 8, 2026, alteration permit (RES-ALT-ADD-26-001135) describes work on the kitchen and bathroom, including converting a back room into a bathroom adjoining a bedroom. It also lists lighting, electrical, and water-heater updates.
Is there foundation work planned at 700 N Beacon St?
Yes. A residential foundation repair permit filed March 26, 2026, describes resetting and reshimming 1,393 square feet to stabilize the foundation.
Are new electrical and plumbing permits listed for 700 N Beacon St?
Yes. A July 10, 2026, electrical permit lists replacement of the electrical panel, and an August 4, 2026, plumbing permit lists bathroom plumbing work.
Also being built nearby
All of 75214- 710 N Beacon StSep 17, 2026Whole home gas stest-----repair was to a gas shut off volve for the stove · 9 m away
- 715 Huntley StMay 12, 2025Remove and replace 1 full hvac system · 99 m away
- 718 Parkmont StMar 31, 2026Trane gas 3 ton deluxe hz · 110 m away
- 706 Huntley StDec 29, 2025New gas relay from meter to pool heater · 111 m away
- 710 Huntley StJun 27, 2025Gas test · 111 m away
- 714 Huntley StSep 29, 2025Installing feed thru panel with breaker slops off meter base. will need disconnect then reconnect to get homeowners power back on fast. will need release from dallas to get the power installed back one we finish work after disconnect from power company · 112 m away
- 718 Huntley StJun 27, 2025Nsfaa-removing failing front porch columns, add a new pressure treated post, rebuilding the brick columns to best available match on the existing foundation · 112 m away
- 726 Huntley StJul 9, 2025Replace existing overheating sub panel located indoors, install surge protection. note home has existing 1st responder panel located outdoors · 113 m away
- 5623 Worth StSep 1, 2026Tunnel under home and replace all sewer lines and main sewer line in yard with schedule 40 pvc · 118 m away
- 5638 Junius StDec 24, 2025Addition historic district · 120 m away
- 711 Parkmont StFeb 13, 2026711 parkmont reset reshim 1398 sq ft to stabilize foundation · 123 m away
- 715 Parkmont StAug 25, 2026Addition to detached garage · 123 m away