726 Huntley St
Dallas, TX 75214
726 Huntley St: 1 project on record
City of Dallas lists 1 filing across 1 project at 726 Huntley St, Dallas, TX 75214. The most recent, filed July 9, 2025, covers: “Replace existing overheating sub panel located indoors, install surge protection. note home has existing 1st responder panel located outdoors”.
Compiled from City of Dallas records · updated Jul 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 9, 2025
- since Jul 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace existing overheating sub panel located indoors, install surge protection. note home has existing 1st responder panel located outdoors
Replace existing overheating sub panel located indoors, install surge protection. note home has existing 1st responder panel located outdoors
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 726 Huntley St
What is being built at 726 Huntley St?
The latest filing (City of Dallas permit RES-ELC-25-001276, July 9, 2025) covers replace existing overheating sub panel located indoors, install surge protection. note home has existing 1st responder panel located outdoors.
How many permits and filings does 726 Huntley St have?
1 filing across 1 project, from July 9, 2025 to July 9, 2025.
Is there other construction near 726 Huntley St?
Yes. Nearby filings include 718 Huntley St (nsfaa-removing failing front porch columns, add a new pressure treated post, rebuilding the brick columns to best available match on the existing foundation, Jun 27, 2025); 714 Huntley St (installing feed thru panel with breaker slops off meter base. will need disconnect then reconnect to get homeowners power back on fast. will need release from dallas to get the power installed back one we finish work after disconnect from power company, Sep 29, 2025); 710 Huntley St (gas test, Jun 27, 2025).
How do I get alerts for new permits at 726 Huntley St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 718 Huntley StJun 27, 2025Nsfaa-removing failing front porch columns, add a new pressure treated post, rebuilding the brick columns to best available match on the existing foundation · 7 m away
- 714 Huntley StSep 29, 2025Installing feed thru panel with breaker slops off meter base. will need disconnect then reconnect to get homeowners power back on fast. will need release from dallas to get the power installed back one we finish work after disconnect from power company · 11 m away
- 710 Huntley StJun 27, 2025Gas test · 14 m away
- 715 Huntley StMay 12, 2025Remove and replace 1 full hvac system · 17 m away
- 706 Huntley StDec 29, 2025New gas relay from meter to pool heater · 18 m away
- 5638 Junius StDec 24, 2025Addition historic district · 37 m away
- 711 Glendale StNov 18, 2026Gas test · 96 m away
- 726 Glendale StSep 15, 20253 spread footer with sonotube set359 ft lineal feet of floor joist150 ft lineal feet of girder beam1 understructure shimming of existing pier and beam supports to improve floor slopes · 108 m away
- 710 N Beacon StSep 17, 2026Whole home gas stest-----repair was to a gas shut off volve for the stove · 112 m away
- 700 Glendale StAug 25, 2026Gas test · 112 m away
- 700 N Beacon StAug 4, 2026Plumbing out bathroom · 113 m away
- 5728 Junius StOct 14, 2026Gas test, release for atmos · 139 m away