710 Huntley St
Dallas, TX 75214
710 Huntley St: 1 project on record
City of Dallas lists 1 filing across 1 project at 710 Huntley St, Dallas, TX 75214. The most recent, filed June 27, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Jun 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2025
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 710 Huntley St
What is being built at 710 Huntley St?
The latest filing (City of Dallas permit RES-PLM-25-001911, June 27, 2025) covers gas test.
How many permits and filings does 710 Huntley St have?
1 filing across 1 project, from June 27, 2025 to June 27, 2025.
Is there other construction near 710 Huntley St?
Yes. Nearby filings include 714 Huntley St (installing feed thru panel with breaker slops off meter base. will need disconnect then reconnect to get homeowners power back on fast. will need release from dallas to get the power installed back one we finish work after disconnect from power company, Sep 29, 2025); 706 Huntley St (new gas relay from meter to pool heater, Dec 29, 2025); 718 Huntley St (nsfaa-removing failing front porch columns, add a new pressure treated post, rebuilding the brick columns to best available match on the existing foundation, Jun 27, 2025).
How do I get alerts for new permits at 710 Huntley St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 714 Huntley StSep 29, 2025Installing feed thru panel with breaker slops off meter base. will need disconnect then reconnect to get homeowners power back on fast. will need release from dallas to get the power installed back one we finish work after disconnect from power company · 4 m away
- 706 Huntley StDec 29, 2025New gas relay from meter to pool heater · 4 m away
- 718 Huntley StJun 27, 2025Nsfaa-removing failing front porch columns, add a new pressure treated post, rebuilding the brick columns to best available match on the existing foundation · 7 m away
- 715 Huntley StMay 12, 2025Remove and replace 1 full hvac system · 13 m away
- 726 Huntley StJul 9, 2025Replace existing overheating sub panel located indoors, install surge protection. note home has existing 1st responder panel located outdoors · 14 m away
- 5638 Junius StDec 24, 2025Addition historic district · 23 m away
- 711 Glendale StNov 18, 2026Gas test · 96 m away
- 726 Glendale StSep 15, 20253 spread footer with sonotube set359 ft lineal feet of floor joist150 ft lineal feet of girder beam1 understructure shimming of existing pier and beam supports to improve floor slopes · 109 m away
- 700 Glendale StAug 25, 2026Gas test · 110 m away
- 710 N Beacon StSep 17, 2026Whole home gas stest-----repair was to a gas shut off volve for the stove · 111 m away
- 700 N Beacon StAug 4, 2026Plumbing out bathroom · 111 m away
- 5701 Worth StMar 16, 2026Hvac change out – remove & replace 1 full amana upflow/downflow heat pump system serving the upstairs portion of the home. installation includes a new outdoor condenser located at the back right of the home and a new indoor air handler placed in the upstairs closet accessed via the staircase. surge protection will be installed on both indoor and outdoor units. existing ductwork will be reused; the air scrubber from the upstairs unit will be moved to the downstairs system · 135 m away