2808 Gould St
Dallas, TX 75215
Permits cover 28 unit replacements and two reroofs
Commercial permits for 2808 Gould St cover replacing 28 units and reroofing the property. Dallas filed the first reroof permit on July 24, 2025, another on December 9, 2025, and the mechanical permit on May 18, 2026.
Summarized from City of Dallas records · updated May 18, 2026
- Projects
- 3
- 3 filings
- Latest filing
- May 18, 2026
- since Jul 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 2808 Gould St
What work is permitted at 2808 Gould St in Dallas?
Dallas permits list replacement of 28 units and two reroofing projects at the commercial property.
What does the permit say will replace 28 units?
The May 18, 2026 commercial mechanical permit, COM-MEC-26-001164, says “Replace 28 units.” It does not specify what kind of units.
When were the permits filed for 2808 Gould St?
The records span July 24, 2025, through May 18, 2026. The two reroof permits were filed July 24 and December 9, 2025.
Are they building a new structure at 2808 Gould St?
The listed permits describe mechanical replacement and reroofing work, not new construction.
What is being permitted near The Pot Baked Potato Bar Renovation?
At 2808 Gould St, about 261 meters from The Pot Baked Potato Bar Renovation, Dallas records list replacement of 28 units and two reroofing permits.
Also being built nearby
All of 75215- 2815 Gould StJul 28, 2026New construction of five units on one lot with a proposed mutual access agreement · 15 m away
- 2819 Gould StJul 30, 2026A new construction of five dwelling units on one lot with a proposed mutual access easement · 19 m away
- 2829 Gould StAug 4, 2026Install hvac system and ductwork · 30 m away
- 2829 Cleveland StJun 15, 2026Installation of 6' tall 3-rail ornamental steel fence around perimeter with 2 - 25' wide automatic single sliding gates with knox padlock, knox key switch, & opticoms · 86 m away
- 2804 Cleveland StAug 8, 2025T-pole installation for construction trailer · 94 m away
- 1324 Al Lipscomb WayJul 10, 2025Remove concrete paving · 117 m away
- 2719 Cleveland StApr 20, 2026Install new plumbing · 150 m away
- 2705 Cleveland StDec 22, 2025The 2705 cleveland project is a multi-unit urban infill residential development designed to maximize efficiency on a narrow lot. the attached townhomes are organized in a row configuration with front-facing pedestrian entries and rear-alley-loaded garages, consistent with dallas infill design standards.each residence features an open-concept first floor, integrating living, kitchen, and dining spaces, while maintaining privacy for one downstairs bedroom. the second floor is dedicated to private living spaces, including a generous master suite, a flex office space, and an additional bedroom and bath. the design promotes modern urban living with efficient mechanical layouts, simple roof geometry, and clean elevations · 166 m away
- 2708 Parnell StMay 20, 2026In person qteam meeting 3.24.2026 (1:30 pm) new construction of 21 units of multifamily dwellings · 173 m away
- 2819 Holmes StNov 16, 2026Apartment 206gas test · 189 m away
- 2823 Holmes StMar 25, 20262' lavatory drain · 189 m away
- 2900 Botham Jean BlvdJan 22, 2026Clean & show no work · 227 m away