2819 Holmes St
Dallas, TX 75215
Gas service test permitted at 2819 Holmes St
A City of Dallas residential plumbing permit records a gas test for service at 2819 Holmes St. The permit was filed on November 21, 2025; the record does not describe a new building or other construction.
Summarized from City of Dallas records · updated Nov 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 16, 2026
- since Nov 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2819 Holmes St
What work is permitted at 2819 Holmes St in Dallas?
A City of Dallas residential plumbing permit records a gas test for service. The permit number is RES-PLM-25-007846.
When was the permit for 2819 Holmes St filed?
The permit was filed on November 21, 2025.
Is a new home being built at 2819 Holmes St?
The available permit describes a gas test for service, not new home construction.
Is there a permit for gas work near Cornerstone Community Development Corporation?
A permit for a gas test for service was filed at 2819 Holmes St, about 184 meters from Cornerstone Community Development Corporation at 2904 S. Ervay Street.
What is happening near Purpose Palace On The Park?
The record at 2819 Holmes St, about 233 meters from Purpose Palace On The Park, describes a gas test for service. It does not identify other work at the landmark.
Also being built nearby
All of 75215- 2823 Holmes StMar 25, 20262' lavatory drain · 6 m away
- 2804 Cleveland StAug 8, 2025T-pole installation for construction trailer · 97 m away
- 2829 Cleveland StJun 15, 2026Installation of 6' tall 3-rail ornamental steel fence around perimeter with 2 - 25' wide automatic single sliding gates with knox padlock, knox key switch, & opticoms · 107 m away
- 2801 S Ervay StNov 13, 2025Electrical work · 129 m away
- 2728 Holmes StOct 28, 2020Repair meter base socket only · 131 m away
- 2901 S Ervay StAug 14, 2025Relocate electric service/meter · 171 m away
- 2719 Cleveland StApr 20, 2026Install new plumbing · 177 m away
- 2913 S Ervay StJan 29, 2026Cleaning the buliding. need electric conection · 182 m away
- 2904 S. Ervay Street · Cornerstone Community Development Corporation Inc.Oct 13, 2025Cornerstone baptist church restaurant — new construction — demolition of existing conditions, build new facility · 184 m away
- 2904 S Ervay StSep 15, 2026Remove old roofing and replace · 184 m away
- 2808 Gould StMay 18, 2026Replace 28 units · 189 m away
- 2705 Cleveland StDec 22, 2025The 2705 cleveland project is a multi-unit urban infill residential development designed to maximize efficiency on a narrow lot. the attached townhomes are organized in a row configuration with front-facing pedestrian entries and rear-alley-loaded garages, consistent with dallas infill design standards.each residence features an open-concept first floor, integrating living, kitchen, and dining spaces, while maintaining privacy for one downstairs bedroom. the second floor is dedicated to private living spaces, including a generous master suite, a flex office space, and an additional bedroom and bath. the design promotes modern urban living with efficient mechanical layouts, simple roof geometry, and clean elevations · 191 m away