2823 Holmes St
Dallas, TX 75215
Fire-damage repairs permitted at an apartment building
Dallas permits indicate remodeling and repairs to a fire-damaged apartment building at 2823 Holmes St. The first listed permit was dated Oct. 8, 2025, and the latest, for a lavatory drain, was dated March 25, 2026.
Summarized from City of Dallas records · updated Mar 25, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Mar 25, 2026
- since Oct 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 2823 Holmes St
What is happening at 2823 Holmes St in Dallas?
City of Dallas permits indicate remodeling and repairs to an apartment building damaged by fire. The records include interior remodeling and plumbing work.
Is a new apartment building being built at 2823 Holmes St?
The permits describe remodeling an existing apartment building after fire damage, not construction of a new building.
When were permits issued for 2823 Holmes St?
The earliest listed permit is dated Oct. 8, 2025, and the latest is dated March 25, 2026.
What fire damage repairs are planned at 2823 Holmes St?
Permits dated Nov. 5 and Dec. 5, 2025, describe interior remodeling and a remodel due to fire damage. The Dec. 5 permit is COM-ALT-ADD-25-001799.
What plumbing work is permitted at 2823 Holmes St?
A City of Dallas commercial plumbing permit dated March 25, 2026, describes a 2-foot lavatory drain. Its permit number is COM-PLM-26-001165.
Is the work at 2823 Holmes St for an apartment building?
Yes. A permit dated Oct. 8, 2025, describes a remodel of an apartment building due to fire damage; its number is COM-ALT-ADD-25-001423.
Also being built nearby
All of 75215- 2819 Holmes StNov 16, 2026Apartment 206gas test · 6 m away
- 2804 Cleveland StAug 8, 2025T-pole installation for construction trailer · 98 m away
- 2829 Cleveland StJun 15, 2026Installation of 6' tall 3-rail ornamental steel fence around perimeter with 2 - 25' wide automatic single sliding gates with knox padlock, knox key switch, & opticoms · 107 m away
- 2801 S Ervay StNov 13, 2025Electrical work · 131 m away
- 2728 Holmes StOct 28, 2020Repair meter base socket only · 136 m away
- 2901 S Ervay StAug 14, 2025Relocate electric service/meter · 167 m away
- 2913 S Ervay StJan 29, 2026Cleaning the buliding. need electric conection · 178 m away
- 2904 S. Ervay Street · Cornerstone Community Development Corporation Inc.Oct 13, 2025Cornerstone baptist church restaurant — new construction — demolition of existing conditions, build new facility · 180 m away
- 2904 S Ervay StSep 15, 2026Remove old roofing and replace · 180 m away
- 2719 Cleveland StApr 20, 2026Install new plumbing · 181 m away
- 2808 Gould StMay 18, 2026Replace 28 units · 189 m away
- 2705 Cleveland StDec 22, 2025The 2705 cleveland project is a multi-unit urban infill residential development designed to maximize efficiency on a narrow lot. the attached townhomes are organized in a row configuration with front-facing pedestrian entries and rear-alley-loaded garages, consistent with dallas infill design standards.each residence features an open-concept first floor, integrating living, kitchen, and dining spaces, while maintaining privacy for one downstairs bedroom. the second floor is dedicated to private living spaces, including a generous master suite, a flex office space, and an additional bedroom and bath. the design promotes modern urban living with efficient mechanical layouts, simple roof geometry, and clean elevations · 196 m away