10028 Elf St
Dallas, TX 75217
10028 Elf St: 1 project on record
City of Dallas lists 1 filing across 1 project at 10028 Elf St, Dallas, TX 75217. The most recent, filed August 29, 2025, covers: “Install 50 gallon electric water heater in garage (swap out)”.
Compiled from City of Dallas records · updated Aug 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 29, 2025
- since Aug 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10028 Elf St
What is being built at 10028 Elf St?
The latest filing (City of Dallas permit RES-PLM-25-004326, August 29, 2025) covers install 50 gallon electric water heater in garage (swap out).
How many permits and filings does 10028 Elf St have?
1 filing across 1 project, from August 29, 2025 to August 29, 2025.
Is there other construction near 10028 Elf St?
Yes. Nearby filings include 10020 Elf St (install plumbing for bathroom, Sep 24, 2026); 1214 Lufkin St (gas release, Jul 2, 2025); 1227 N Masters Dr (adding exterior do to an existing building along with exterior painting, Aug 7, 2026).
How do I get alerts for new permits at 10028 Elf St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75217- 10020 Elf StSep 24, 2026Install plumbing for bathroom · 29 m away
- 1214 Lufkin StJul 2, 2025Gas release · 152 m away
- 1227 N Masters DrAug 7, 2026Adding exterior do to an existing building along with exterior painting · 196 m away
- 1156 N Masters DrJan 15, 2026Install electrical service for a charter power supply cabinet · 228 m away
- 1020 Algonquin DrDec 12, 2025Installation of a grid tied, roof mounted, solar pv system · 232 m away
- 10106 Lake June RdNov 19, 20252'-0" x 12'-2" covered canopy with 4' fixture (with arms) · 272 m away
- 1031 Algonquin DrNov 16, 2026Work of the project generally includes, but is not limited to: 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) a. gsts will have a 33-ft side water depth and will be type d110 or d115 2. addition of new yard piping, temporary piping, and tie-ins required to connect and operate the new gsts with the existing lake june pump station. 3. construction of a new overflow basin near the gsts. 4. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 5. temporary site grading improvements. 6. site improvements to support items above including paving, grading, and drainage infrastructure. 7. site electrical improvements to support items above including duct banks and control equipment · 287 m away
- 10203 Glenn Vista DrOct 8, 2025Gas pressure test · 292 m away
- 10025 Lake June RdNov 24, 2020Service release no work · 298 m away
- 10211 Budtime LnJul 28, 2025Fence around house, 8 ft tall fence · 300 m away
- 1268 N Masters DrNov 18, 2025Gas test for atmos gas meter release · 302 m away
- 1013 Algonquin DrJan 22, 2026Nsfaa attached to sfd is a storage and we are closing it with wood siding, 5 windows, and adding a door · 302 m away