1013 Algonquin Dr
Dallas, TX 75217
Attached home storage area to be enclosed
A City of Dallas permit indicates an attached storage area at 1013 Algonquin Dr will be enclosed with wood siding and five windows, with a door added. The residential alteration and addition permit was filed January 22, 2026.
Summarized from City of Dallas records · updated Jan 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 22, 2026
- since Jan 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNsfaa attached to sfd is a storage and we are closing it with wood siding, 5 windows, and adding a door
Nsfaa attached to sfd is a storage and we are closing it with wood siding, 5 windows, and adding a door
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 1013 Algonquin Dr
What is being built at 1013 Algonquin Dr?
A City of Dallas permit describes work to enclose an attached storage area at a single-family dwelling with wood siding and five windows, and to add a door.
Is a new house being built at 1013 Algonquin Dr?
The record is for a residential alteration and addition, not a new-construction permit. It describes work on an attached storage area.
When was the permit filed for 1013 Algonquin Dr?
The City of Dallas filed permit RES-ALT-ADD-26-000119 on January 22, 2026.
What changes does the permit list at 1013 Algonquin Dr?
The permit description lists wood siding, five windows and an added door to close in an attached storage area.
What kind of permit is RES-ALT-ADD-26-000119?
It is a City of Dallas Residential Alteration Addition Permit filed January 22, 2026.
Also being built nearby
All of 75217- 1031 Algonquin DrNov 16, 2026Work of the project generally includes, but is not limited to: 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) a. gsts will have a 33-ft side water depth and will be type d110 or d115 2. addition of new yard piping, temporary piping, and tie-ins required to connect and operate the new gsts with the existing lake june pump station. 3. construction of a new overflow basin near the gsts. 4. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 5. temporary site grading improvements. 6. site improvements to support items above including paving, grading, and drainage infrastructure. 7. site electrical improvements to support items above including duct banks and control equipment · 16 m away
- 9851 Paramount AveOct 9, 2020Replace water service · 58 m away
- 1020 Algonquin DrDec 12, 2025Installation of a grid tied, roof mounted, solar pv system · 72 m away
- 9827 Paramount AveSep 9, 2026Replace 1- 4 ton electric heat pump · 100 m away
- 919 Lufkin StJun 12, 2025Install 50 gallon electric water heater · 174 m away
- 9830 Paramount AveJan 28, 2021Install roof mounted solar panels · 177 m away
- 9818 Paramount AveDec 8, 2020Install water heater · 192 m away
- 10111 Laneyvale AveOct 9, 2026Rsvp-this is a residential new construction project consisting of a 1,356-square-foot house, a 44-square-foot front porch, and a 25-square-foot rear porch. the site improvements include a 280-square-foot concrete parking pad, and 221.6 square feet of concrete walkways.as part of the new construction, the project also includes the demolition of the existing damaged city sidewalk and its replacement with 877.46 square feet of new concrete sidewalk · 218 m away
- 10129 Laneyvale AveNov 21, 202510129 laneyvale install 16 concrete pilings to stabilize foundation · 249 m away
- 10137 Laneyvale AveMay 16, 2026Mcr with battery install 27 panels roof-mounted pv solar system \| install a battery—disconnect/reconnect needed · 260 m away
- 928 Brae Loch DrMar 9, 2026Replace 40 gallon electric water heater located in the garage · 284 m away
- 10020 Elf StSep 24, 2026Install plumbing for bathroom · 292 m away