Active · latest filing Sep 2026Residential
9827 Paramount Ave
Dallas, TX 75217
4-ton electric heat pump replacement at 9827 Paramount Ave
A City of Dallas residential mechanical permit indicates a 4-ton electric heat pump is being replaced at 9827 Paramount Ave. The permit was filed September 9, 2026 (RES-MEC-26-004971).
Summarized from City of Dallas records · updated Sep 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2026
- since Sep 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9827 Paramount Ave
What work is permitted at 9827 Paramount Ave?
A City of Dallas permit describes replacing a 4-ton electric heat pump. The permit number is RES-MEC-26-004971.
When was the heat pump permit filed?
The permit was filed September 9, 2026.
What size heat pump is being replaced at 9827 Paramount Ave?
The permit description specifies a 4-ton electric heat pump.
Is this a new home construction project?
The record is a residential mechanical permit for a heat pump replacement, not a new-home construction permit.
How much will the heat pump replacement cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 75217- 9851 Paramount AveOct 9, 2020Replace water service · 42 m away
- 9830 Paramount AveJan 28, 2021Install roof mounted solar panels · 78 m away
- 9818 Paramount AveDec 8, 2020Install water heater · 93 m away
- 1013 Algonquin DrJan 22, 2026Nsfaa attached to sfd is a storage and we are closing it with wood siding, 5 windows, and adding a door · 100 m away
- 1031 Algonquin DrNov 16, 2026Work of the project generally includes, but is not limited to: 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) a. gsts will have a 33-ft side water depth and will be type d110 or d115 2. addition of new yard piping, temporary piping, and tie-ins required to connect and operate the new gsts with the existing lake june pump station. 3. construction of a new overflow basin near the gsts. 4. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 5. temporary site grading improvements. 6. site improvements to support items above including paving, grading, and drainage infrastructure. 7. site electrical improvements to support items above including duct banks and control equipment · 103 m away
- 1020 Algonquin DrDec 12, 2025Installation of a grid tied, roof mounted, solar pv system · 139 m away
- 9703 Paramount AveJul 14, 2026Whole home gas test · 202 m away
- 9732 Laneyvale AveSep 28, 2020No layout changes allowed · 235 m away
- 919 Lufkin StJun 12, 2025Install 50 gallon electric water heater · 263 m away
- 928 Brae Loch DrMar 9, 2026Replace 40 gallon electric water heater located in the garage · 263 m away
- 9701 San Leon AveDec 22, 2020Install lawn sprinkler · 267 m away
- 10111 Laneyvale AveOct 9, 2026Rsvp-this is a residential new construction project consisting of a 1,356-square-foot house, a 44-square-foot front porch, and a 25-square-foot rear porch. the site improvements include a 280-square-foot concrete parking pad, and 221.6 square feet of concrete walkways.as part of the new construction, the project also includes the demolition of the existing damaged city sidewalk and its replacement with 877.46 square feet of new concrete sidewalk · 291 m away