9818 Paramount Ave
Dallas, TX 75217
9818 Paramount Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 9818 Paramount Ave, Dallas, TX 75217. The most recent, filed December 8, 2020, covers: “Install water heater”.
Compiled from City of Dallas records · updated Dec 8, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2020
- since Dec 8, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 9818 Paramount Ave
What is being built at 9818 Paramount Ave?
The latest filing (City of Dallas permit 2012083019, December 8, 2020) covers install water heater.
How many permits and filings does 9818 Paramount Ave have?
1 filing across 1 project, from December 8, 2020 to December 8, 2020.
How much is the construction at 9818 Paramount Ave worth?
Permits at this address list about $1 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 9818 Paramount Ave?
Yes. Nearby filings include 9830 Paramount Ave (install roof mounted solar panels, Jan 28, 2021); 9827 Paramount Ave (replace 1- 4 ton electric heat pump, Sep 9, 2026); 9703 Paramount Ave (whole home gas test, Jul 14, 2026).
How do I get alerts for new permits at 9818 Paramount Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75217- 9830 Paramount AveJan 28, 2021Install roof mounted solar panels · 15 m away
- 9827 Paramount AveSep 9, 2026Replace 1- 4 ton electric heat pump · 93 m away
- 9703 Paramount AveJul 14, 2026Whole home gas test · 112 m away
- 9851 Paramount AveOct 9, 2020Replace water service · 134 m away
- 9732 Laneyvale AveSep 28, 2020No layout changes allowed · 163 m away
- 1013 Algonquin DrJan 22, 2026Nsfaa attached to sfd is a storage and we are closing it with wood siding, 5 windows, and adding a door · 192 m away
- 9701 San Leon AveDec 22, 2020Install lawn sprinkler · 195 m away
- 1031 Algonquin DrNov 16, 2026Work of the project generally includes, but is not limited to: 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) a. gsts will have a 33-ft side water depth and will be type d110 or d115 2. addition of new yard piping, temporary piping, and tie-ins required to connect and operate the new gsts with the existing lake june pump station. 3. construction of a new overflow basin near the gsts. 4. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 5. temporary site grading improvements. 6. site improvements to support items above including paving, grading, and drainage infrastructure. 7. site electrical improvements to support items above including duct banks and control equipment · 195 m away
- 1020 Algonquin DrDec 12, 2025Installation of a grid tied, roof mounted, solar pv system · 226 m away
- 9620 Paramount AveJul 21, 2026Gas test · 253 m away
- 928 Brae Loch DrMar 9, 2026Replace 40 gallon electric water heater located in the garage · 268 m away
- 934 N St Augustine RdSep 22, 2026Replaced electrical riser from meter base due to car hit power pole · 279 m away