Two water storage tanks planned at 1031 Algonquin Dr

Dallas permits filed in February and May 2026 indicate construction of two 10.5-million-gallon ground storage tanks at 1031 Algonquin Dr, replacing an existing 21-million-gallon reservoir. The work also includes demolition of the reservoir and related structures, new piping, an overflow basin, and site improvements. A July 2026 permit covers temporary jobsite power.

Summarized from City of Dallas records · updated Nov 16, 2026

Projects
3
3 filings
Latest filing
Nov 16, 2026
since Nov 16, 2026
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Work of the project generally includes, but is not limited to: 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) a. gsts will have a 33-ft side water depth and will be type d110 or d115 2. addition of new yard piping, temporary piping, and tie-ins required to connect and operate the new gsts with the existing lake june pump station. 3. construction of a new overflow basin near the gsts. 4. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 5. temporary site grading improvements. 6. site improvements to support items above including paving, grading, and drainage infrastructure. 7. site electrical improvements to support items above including duct banks and control equipment

    Work of the project generally includes, but is not limited to: 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) a. gsts will have a 33-ft side water depth and will be type d110 or d115 2. addition of new yard piping, temporary piping, and tie-ins required to connect and operate the new gsts with the existing lake june pump station. 3. construction of a new overflow basin near the gsts. 4. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 5. temporary site grading improvements. 6. site improvements to support items above including paving, grading, and drainage infrastructure. 7. site electrical improvements to support items above including duct banks and control equipment

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001211
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of a temporary power for jobsite trailer

    Installation of a temporary power for jobsite trailer

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-003532
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) to replace the existing 21 million gallon reservoir. a. gsts will have a 33-ft side water depth and will be type d110 or d1152. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 3. backfill and hydroseeding at demolished storage reservoir, inlet structure, and outlet structure to match surrounding existing grade.note: dallas water utilities has their own on-site inspectors who will perform inspections and confirm scope is performed per drawings and specifications

    1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) to replace the existing 21 million gallon reservoir. a. gsts will have a 33-ft side water depth and will be type d110 or d1152. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 3. backfill and hydroseeding at demolished storage reservoir, inlet structure, and outlet structure to match surrounding existing grade.note: dallas water utilities has their own on-site inspectors who will perform inspections and confirm scope is performed per drawings and specifications

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000305
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 1031 Algonquin Dr

What is being built at 1031 Algonquin Dr?

Dallas permits indicate two 10.5-million-gallon ground storage tanks will replace an existing 21-million-gallon reservoir. The work also includes new piping and an overflow basin.

Is the existing reservoir at 1031 Algonquin Dr being demolished?

Yes. Permit COM-ALT-ADD-26-000305, filed February 10, 2026, includes demolition of the existing reservoir, inlet structure, and outlet structure.

When were permits filed for the Algonquin Drive water storage project?

The first listed permit was filed February 10, 2026, followed by another on May 20, 2026. A temporary jobsite power permit was filed July 31, 2026.

What is permit COM-ALT-ADD-26-001211 for?

Filed May 20, 2026, the Dallas permit describes two new 10.5-million-gallon ground storage tanks, piping and tie-ins, an overflow basin, demolition, and related site and electrical improvements.

Is temporary power being installed at 1031 Algonquin Dr?

Yes. Dallas permit COM-ELC-26-003532, filed July 31, 2026, is for temporary power for a jobsite trailer.

Also being built nearby