919 Lufkin St
Dallas, TX 75217
919 Lufkin St: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 919 Lufkin St, Dallas, TX 75217 since June 2, 2025. The most recent, filed June 12, 2025, covers: “Install 50 gallon electric water heater”.
Compiled from City of Dallas records · updated Jun 12, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 12, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 919 Lufkin St
What is being built at 919 Lufkin St?
The latest filing (City of Dallas permit RES-PLM-25-001163, June 12, 2025) covers install 50 gallon electric water heater.
How many permits and filings does 919 Lufkin St have?
2 filings across 2 projects, from June 2, 2025 to June 12, 2025.
Is there other construction near 919 Lufkin St?
Yes. Nearby filings include 10111 Laneyvale Ave (rsvp-this is a residential new construction project consisting of a 1,356-square-foot house, a 44-square-foot front porch, and a 25-square-foot rear porch. the site improvements include a 280-square-foot concrete parking pad, and 221.6 square feet of concrete walkways.as part of the new construction, the project also includes the demolition of the existing damaged city sidewalk and its replacement with 877.46 square feet of new concrete sidewalk, Oct 9, 2026); 10129 Laneyvale Ave (10129 laneyvale install 16 concrete pilings to stabilize foundation, Nov 21, 2025); 10137 Laneyvale Ave (mcr with battery install 27 panels roof-mounted pv solar system \| install a battery—disconnect/reconnect needed, May 16, 2026).
How do I get alerts for new permits at 919 Lufkin St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75217- 10111 Laneyvale AveOct 9, 2026Rsvp-this is a residential new construction project consisting of a 1,356-square-foot house, a 44-square-foot front porch, and a 25-square-foot rear porch. the site improvements include a 280-square-foot concrete parking pad, and 221.6 square feet of concrete walkways.as part of the new construction, the project also includes the demolition of the existing damaged city sidewalk and its replacement with 877.46 square feet of new concrete sidewalk · 73 m away
- 10129 Laneyvale AveNov 21, 202510129 laneyvale install 16 concrete pilings to stabilize foundation · 84 m away
- 10137 Laneyvale AveMay 16, 2026Mcr with battery install 27 panels roof-mounted pv solar system \| install a battery—disconnect/reconnect needed · 92 m away
- 1013 Algonquin DrJan 22, 2026Nsfaa attached to sfd is a storage and we are closing it with wood siding, 5 windows, and adding a door · 174 m away
- 1031 Algonquin DrNov 16, 2026Work of the project generally includes, but is not limited to: 1. construction of two 10.5 million gallon (mg) ground storage tanks (gsts) a. gsts will have a 33-ft side water depth and will be type d110 or d115 2. addition of new yard piping, temporary piping, and tie-ins required to connect and operate the new gsts with the existing lake june pump station. 3. construction of a new overflow basin near the gsts. 4. demolition of the existing 21-mg storage reservoir, inlet structure, and outlet structure. 5. temporary site grading improvements. 6. site improvements to support items above including paving, grading, and drainage infrastructure. 7. site electrical improvements to support items above including duct banks and control equipment · 182 m away
- 1016 N Masters DrAug 9, 2026Demolition to complete clean slate · 192 m away
- 1020 Algonquin DrDec 12, 2025Installation of a grid tied, roof mounted, solar pv system · 208 m away
- 855 N Masters DrJul 23, 2026Release electrical service · 217 m away
- 9851 Paramount AveOct 9, 2020Replace water service · 223 m away
- 10007 Kittyhawk LnOct 8, 2026Gas line replacement · 228 m away
- 10115 Kittyhawk LnNov 18, 2020Upgrade existing electrical service · 234 m away
- 10119 Kittyhawk LnNov 13, 2025Gas test for gas service · 236 m away