1215 S Selva Dr
Dallas, TX 75218
1215 S Selva Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 1215 S Selva Dr, Dallas, TX 75218. The most recent, filed January 18, 2021, covers: “Replace or modify existing hvac”.
Compiled from City of Dallas records · updated Jan 18, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 18, 2021
- since Jan 18, 2021
- Largest scope
- —
- Listed value
- $32K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 1215 S Selva Dr
What is being built at 1215 S Selva Dr?
The latest filing (City of Dallas permit 2101183018, January 18, 2021) covers replace or modify existing hvac.
How many permits and filings does 1215 S Selva Dr have?
1 filing across 1 project, from January 18, 2021 to January 18, 2021.
How much is the construction at 1215 S Selva Dr worth?
Permits at this address list about $32K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 1215 S Selva Dr?
Yes. Nearby filings include 1207 S Selva Dr (interior remodel only, Nov 20, 2020); 9816 Angora St (move washer box new gas line to tankless, Jun 16, 2025); 1237 S Selva Dr (install roofing mountage solar panels, Jan 12, 2021).
How do I get alerts for new permits at 1215 S Selva Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 1207 S Selva DrNov 20, 2020Interior remodel only · 29 m away
- 9816 Angora StJun 16, 2025Move washer box new gas line to tankless · 33 m away
- 1237 S Selva DrJan 12, 2021Install roofing mountage solar panels · 57 m away
- 9909 Garland RdOct 13, 2020Repair to sewer main · 108 m away
- 1206 Tranquilla DrOct 5, 2026Gas pressure test · 116 m away
- 1207 Tranquilla DrJan 26, 2026Install two (2) tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter & generation panel. utility shutdown needed to install tesla energy gateway-3 · 121 m away
- 9907 Angora StJun 30, 2025This project includes excavation, repiping, and backfilling over a projected 6day timeline. scope of work covers repiping all existing cast iron under the home with new schedule 40 pvc, including a new 2" ptrap and double cleanouts accessed via 5' of tunneling under the beam. a new sewer line will be installed from the foundation to the city tap. all work will be completed under a city of dallas permit and includes a 3year warranty on all underslab piping · 135 m away
- 9915 Garland RdDec 8, 2025In wall plumbing and setting fixtures · 147 m away
- 9922 Angora StJan 21, 2021Remove existing roof and install new roof · 154 m away
- 9925 Angora StNov 25, 2020Permit to complete work started for permits (1808011089 & 1808011093) · 156 m away
- 9714 Losa DrSep 22, 2020Foundation repair · 158 m away
- 9714 Galway DrJan 11, 2021Electrical remodel · 162 m away